Laserfiche WebLink
NORTH PINE <br /> AHETE W. <br /> 1 4551 La ke lDi(ive Fort L.a k N S S025 1 51 s .68+02 <br /> To: Douglas- Kerr Underground, LLC Contact: Ryan Kerr <br /> Address: PO Box 85 Phone: (320)679-8937 <br /> Mora, MN 55051 Fax: (320)679-8940 <br /> Project Name: Riverdale Drive, RevA Bid Number: 22-024 <br /> Project Location: SE Of Hwy-10&Bowers Dr., Ramsey, MN Bid Date: 4/12/2022 <br /> Addendum#: 2 <br /> Item# Item Description Estimated Quantity Unit Unit Price Total Price <br /> 1. Contract <br /> 001 Mobilization 1.00 LS $5,555.00 $5,555.00 <br /> 002 Remove Miscellaneous Structure(Landscaping) 1.00 EACH $425.00 $425.00 <br /> 003 Remove Fence 220.00 LF $3.05 $671.00 <br /> 004 Remove Curb And Gutter 100.00 LF $3.35 $335.00 <br /> 005 Remove Bituminous Pavement 1,670.00 SY $3.75 $6,262.50 <br /> 006 Remove Concrete Pavement 90.00 SY $8.65 $778.50 <br /> 007 Granular Borrow(Cv) 1,000.00 CY $5.10 $5,100.00 <br /> 008 Excavation-Common (P)(Ev) *Export Excess To COR* 18,190.00 CY $2.80 $50f932.00 <br /> 009 Excavation-Channel And Pond 7,760.00 CY $2.15 $16,684.00 <br /> 010 Common Embankment(P)(Cv) 9,150.00 CY $1.75 $16,012.50 <br /> 011 Excavation-Subgrade(Ev) 2,500.00 CY $2.45 $6,125.00 <br /> Total Price for above 1.Contract Items: $108,880.50 <br /> 2. C.O.R. Extra Grading <br /> 012 Strip Topsoil 31100.00 CY $1.00 $3,100.00 <br /> 013 Place&Compact Imported Material (Measured) 8,178.00 CY $3.20 $26,169.60 <br /> 014 Replace Topsoil 31100.00 CY $1.10 $3,410.00 <br /> Total Price for above 2.C.O.R. Extra Grading Items: $32,679.60 <br /> Total Bid Price: $141,560.10 <br /> Notes: <br /> • Price does not include: Bonds and Permits;Clearing&Grubbing;Site Surveying; Soil Testing; Subgrade Prep; Backfilling of Curb; Electrical; <br /> Irrigation; Monuments; Landscaping; Plantings;Gravel or Bituminous; Rock Entrances; Concrete Curb&Gutter;Traffic Control; Building or Structure <br /> Demolition; Hidden or Buried Debris; Hazardous Materials Removal; Street Sweeping; Dewatering;Site Utilities; Moving of Small Utilities; Import of <br /> Dirt,Any Subsoil Corrections or Trench Borrow Not Listed Above; SWPPP Management/Maintenance outside of NPA Work;Any Erosion <br /> Control NOT Listed Above; Removal of Temporary Erosion/Sediment Control BMP's; <br /> • Pricing is based on the engineer(s)plans dated: 2/15/2022 <br /> Proposal is valid for a period of 30 days from date of proposal. <br /> ' This proposal assumes an average topsoil depth of 1.0 foot. <br /> ' Any delays due to incomplete surveying or improper surveying could result in additional charges. <br /> Price does not include lowering/moving small utilities. If there are utilities not properly represented on plans, price is subject to change. <br /> All grading needs to be verified by civil engineer as grading is completed. North Pine Aggregate is not responsible for anything not to grade after <br /> utilities are installed. <br /> • Retainage is NOT to exceed 50/b without prior approval,and is to be released/reduced as our work is approved. <br /> • **Owner/Developer agrees that NPDES Permit will be transferred back to Owner/Developer,as New Contractor,within 10 days <br /> of completion of grading/storm sewer and site is stabilized,with either Erosion Blanket or Seed&Mulch.** <br /> • *Common Excavation price includes hauling excess suitable material to The Center of Ramsey,per sheet 2,note 9. <br /> 4/12/2022 10:34:10 AM Page 1 of 2 <br />