My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 05/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:31:54 PM
Creation date
5/25/2022 8:43:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 14. <br /> Meeting Date: 05/24/2022 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title <br /> Adopt Resolution#22-119 Approving Change Order#2 for Improvement Project#22-05, Riverdale Drive Trunk <br /> Utility Improvements, Llama Street to Bowers Drive <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-119 approving Change Order#2 for Improvement Project <br /> #22-05, Riverdale Drive Trunk Utility Improvements, Llama Street to Bowers Drive. <br /> Background: <br /> The extension of Riverdale Drive between Llama Street and Bowers Drive is needed to support development in the <br /> area. In March 2022, Capstone Homes began construction on the first phase of Riverstone South, a residential <br /> development(244-units at full build out) east of Bowers Drive and south of U.S. Highway 10/169. Commercial <br /> development is also proposed on the land between U.S. Highway 10/169 and the proposed extension of Riverdale <br /> Drive. The developers will pay trunk utility fees as they develop to replenish the trunk utility funds used to pay for <br /> the trunk sanitary sewer and watermain improvements. <br /> Improvement Project#22-05 proposes to construct the trunk sanitary sewer and watermain improvements along the <br /> proposed extension of Riverdale Drive NW between Llama Street NW and Bowers Drive, along with required <br /> storm sewer improvements. The trunk utility improvements are proposed to be constructed ahead of the street <br /> improvements project(Improvement Project#20-05)to better facilitate the proposed construction schedule for <br /> Riverstone South since the trunk utility plans did not need to follow the same plan review process at the Minnesota <br /> Department of Transportation(MnDOT) as the street improvement plans. This allowed the utility improvements to <br /> be bid and constructed months earlier, minimizing the construction schedule for Improvement Project#20-05. <br /> During construction of Improvement Project#22-05,the existing septic system tank serving the abandoned property <br /> at 8846 Highway 10 NW,which was proposed to be removed during Improvement Project#20-05, collapsed <br /> requiring the emergency removal of the tank due to health and safety concerns. Bolton and Menk, the City's design <br /> engineer,worked with Douglas Kerr Underground and MnDOT to prepare the attached Change Order#2 <br /> authorizing Douglas Kerr Underground to immediately pump and remove the septic tank as part of this project at a <br /> cost of$2,800. <br /> The City Engineer signed Change Order#2 before City Council approval was requested due to the health and safety <br /> risks associated with the collapsed septic tank. Staff is therefore requesting after-the-fact approval from the City <br /> Council. <br /> Notification: <br /> Notifications are not required for this case. <br /> Funding Source: <br /> Change Order#2 will be funded through Improvement Project#22-05 using Municipal State Aid funds since the <br /> damage occurred during road grading operations. <br /> Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.