Laserfiche WebLink
CC Regular Session 7. 4. <br /> Meeting Date: 05/24/2022 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title: <br /> Adopt Resolution#22-120 Approving Joint Powers Agreement with Anoka County for Roundabout Improvements <br /> at Alpine Drive and Armstrong Boulevard/County State Aid Highway 83 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-120 approving a Joint Powers Agreement with Anoka County <br /> for proposed 2023 roundabout improvements at Alpine Drive and Armstrong Boulevard/County State Aid <br /> Highway 83. <br /> Background: <br /> Anoka County received grant funds in the amount of$1,350,000 through the Highway Safety Improvement <br /> Program for construction of a single-lane roundabout at the intersection of Alpine Drive and Armstrong <br /> Boulevard/County State Aid Highway(CSAH) 83 in 2023 to improve safety. The legs of this intersection are <br /> skewed and there have been a higher than average number of crashes at this intersection over the years. <br /> The attached Joint Powers Agreement(JPA) includes a layout showing the preliminary roundabout design that <br /> extends approximately 600 feet south of Alpine Driver and 600 feet north of Alpine Drive on CSAH 83/Armstrong <br /> Boulevard, and approximately 500 feet west and 500 feet east of CSAH 83. The cost shares identified within the <br /> JPA are based on this design,which was used to develop the 60-percent plans. <br /> The City's total cost share per the attached JPA is $28,667.64. <br /> Notification: <br /> Notifications are not required for this case. <br /> Time Frame/Observations/Alternatives: <br /> Time Frame: <br /> Staff anticipates 10 minutes will be required to present this case and respond to questions. <br /> Alternatives: <br /> Alternative#1 —Motion to adopt Resolution#22-120 approving a Joint Powers Agreement with Anoka County for <br /> proposed 2023 roundabout improvements at Alpine Drive and Armstrong Boulevard/County State Aid Highway 83. <br /> Alternative#2—Motion to deny adoption of Resolution#22-120 at this time. <br /> Funding Source: <br /> Per the attached JPA,the City's cost share for street improvements including curb and gutter,pavement sections, <br /> storm sewer,trails,ADA compliant pedestrian curb ramps, and turf„is $28,667.64. The proposed funding source for <br /> these costs is Municipal State Aid Funds. <br /> Also,the JPA references the City's plan to extend existing watermain from east of Armstrong Boulevard,under the <br /> roundabout, then west along Alpine Drive to the west end of the proposed reconstruction of Alpine Drive as part of <br />