My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 05/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:31:54 PM
Creation date
5/25/2022 8:43:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Serving Minnesota,Wisconsin,Iowa, <br /> Nebraska,North Dakota,and South Dakota <br /> Od <br /> 3017 161St Ave NW,Andover,MN 55304 <br /> 763-753-1127—Phone <br /> ATHLETE j 763-753-3619—Fax <br /> NSTRUCTIC oi 1 eric@umathleticconstruction.com <br /> MN Contractors No.IR722325 <br /> IA Contractors No.C090307 <br /> April 1,2022 <br /> City of Ramsey <br /> 7550 Sunwood Dr NW <br /> Ramsey,MN 55303 <br /> Re:Fox Park Tennis Court <br /> 17150 Potassium St <br /> We propose the following: <br /> Tennis Court Color Coat System <br /> 1. Power wash surface to remove loose paint,vegetation,dirt and debris—dispose of off site <br /> 2. Machine rout all existing cracks and clean with compressed air—Approx.500 LF <br /> 3. Fill with crack patch binder to level of existing surface with multiple applications and grind smooth <br /> 4. Apply two coats of sand filled acrylic emulsion resurfacer <br /> a. 8-10 lbs.silica sand added per gallon of concentrate material <br /> b. Coverage: .05-.07 gallons per square yard per coat <br /> 5. Apply two coats of latex acrylic paint <br /> a. Color to be selected by owner <br /> b. 6 lbs.silica sand added per gallon of concentrate material <br /> C. Coverage: .05 gallons per square yard per coat <br /> 6. Reline per USTA standards Base Bid$7,500 <br /> Alternate 1—Armor Crack Repair System <br /> All specifications above will remain the same and these will be added after step#4 in the base bid <br /> 1. Furnish and install Armor Crack Repair System to all prepared cracks—Approx. 500 LF <br /> 2. Apply a black acrylic resurfacer blending coat over entire Armor surface according to manufacturer's specifications <br /> a. All cracks shall be covered and masked by the filler coat <br /> 3. Proceed to step#5 in base bid ADD $11,500 <br /> Alternate 2—Net Posts and Tie Down Anchors <br /> 1. Remove net posts,tie downs,concrete footings and dispose of off site <br /> 2. Furnish and install one(1)new set of DTP-3 7 net posts and 1-5/8"tie downs <br /> a. 4000PSI concrete net posts 18"x60"and tie downs 12"x36" ADD $2,500 <br /> Notes: <br /> Standard 1-year material and workmanship warranty <br /> No warranty provided on standard crack repairs from reappearing due to our climate and bituminous movement <br /> Court is unplayable with acrylic paint peeling off and vegetation growing creating a tripping hazard and should be resurfaced in 2022 <br /> Thank you, <br /> Eric Hicks <br /> Upper Midwest Athletic Construction,Inc. <br /> Sourcewellri //101SPORTSUILDERS <br /> MEMBER ASSOCIATION <br /> Awarded Contract <br /> Contract#060518-AST <br />
The URL can be used to link to this page
Your browser does not support the video tag.