My WebLink
|
Help
|
About
|
Sign Out
Home
Ordinance - #05-27 - 10/11/2005
Ramsey
>
Public
>
Ordinances
>
2005
>
Ordinance - #05-27 - 10/11/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 10:50:01 AM
Creation date
10/18/2005 12:03:48 PM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Ordinances
Resolution or Ordinance Number
#05-27
Document Date
10/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant's assertion, including but not limited to, topographic, hydrologic, <br />floristic and/or soil data deemed necessary. <br /> <br />9.26.05 General Standards. The following standards apply to all lands within and/or <br />abutting a wetland: <br /> <br /> Subd. 1. Septic and Soil Absorption Systems. Septic and soil absorption <br />systems must be setback a minimum of seventy-five (75) feet from the City approved boundary <br />of the wetland. <br /> <br /> Subd. 2. Best Management Practices. The MPCA's Best Management Practices <br />shall be followed for the construction of wetland protection methods and related improvements. <br /> <br />9.26.06 <br /> <br />Wetland Buffer Strips - When Required. <br /> <br /> Subd. 1. Wetland Buffer Strip. A wetland buffer strip shall be maintained <br />abutting all wetlands on new lots of record created after November 14, 2005. Lots of record in <br />existence on November 14, 2005 are not subject to the buffer requirements set forth in this <br />Section. At the time a final plat is to be recorded, the developer shall also record a notice of the <br />wetland buffer requirement and prohibited activities against the title to the lot with the office of <br />the Anoka County Recorder. Before the City issues a building permit for a lot with a required <br />wetland buffer, the developer shall install the wetland buffer monumentation required under <br />Section 9.26.08. <br /> <br /> Subd. 2. Wetland Buffer Compliance. Subject properties must comply with the <br />wetland buffer section setbacks from all wetlands including those wetlands not located or only <br />partially located on the subject property. <br /> <br /> Subd. 3. Adjacent Roadways. For roadways that must be aligned either adjacent <br />to or across wetlands and are subject to WCA replacement requirements, additional wetland <br />filling to create a buffer strip shall not be required. All other roadways and trails shall meet the <br />buffer standards established in this Section. <br /> <br /> Subd. 4. Development Grading. For buffers being created during development <br />grading, if the slope subsequent to final grading is greater than twelve (12) percent, then the <br />maximum buffer width for the wetland type is applicable to the area having such slopes. The use <br />of a meandering buffer strip is encouraged to help maintain a natural characteristic but average <br />buffer widths must be adhered to. The widest portion of the buffer should be in areas where <br />surface drainage to the wetland will likely be concentrated. Construction grading should be kept <br />mindful of the areas where surface drainage to the wetland will likely be concentrated and <br />graded appropriately. <br /> <br /> Subd. 5. Voluntary Buffer Creation. Wetland buffer strips not required by this <br />Section may be voluntarily created in conformance with the requirements of this Section <br />concurrent with approval of a site plan, or in the absence of a site plan, upon approval of an <br />administrative permit. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.