Laserfiche WebLink
PAY ESTIMATE #5 <br /> Ramsey Town Center Phase 2, Segment 1 improvements <br />Zeolite Street NW, Civic Center Drive NW:and Sapphire Street NW <br />improvement Project No. 05-22 <br /> <br />.Contractor <br /> <br />BID SCHEDULE "A" - CONTINUED <br /> <br />Item !Description <br /> <br />Estimated Quantity <br /> <br />I 46..!EXTRA DEPTH MANHOLE (OVER 8") 48 <br />t 47 !,4" CONCRETE WALK <br />i 48 iVALLEY GUTTER <br /> <br />31 LF <br />2500 , SF <br />780 i LF <br />5700 I LF <br />132 <br /> <br />i 49 ICONCRETE CURB AND GUTTER <br /> DESIGN <br /> 8618 <br /> , <br /> <br />50 iCONCRETE CURB AND GUTTER DESIGN B~24 <br /> <br />Unit Price <br /> <br />J?" CONCRETE O.~IVEWAY PA,VEMENT <br />! 82 IP~DESTR~AN CURB RAMP <br /> <br /> .] <br />54 F & I 4" RIGID STEEL CONDUIT <br />55 /SIGN PANELS TYPE C <br /> <br />56 ITRAPFIC CONTROL <br /> <br />57 TYPE 111 BARRICADE <br />58 PAVEMENT MESS.AG,E, (LEFT ARROW) EPOXY <br />59 F & I SIGN PANEL TYPE"D" <br /> <br />60 4" BROKEN LINE YELLOW EPOXY <br /> <br />!4" SOLID LINE WHITE - EPOXY <br /> <br />62 124" STOP LINE WHITE. EPOXY <br /> <br />2450 I <br /> <br />89 LF <br />178 I LF <br />30.75 I SF <br />1 LS <br /> <br /> 4 EACH <br /> 4 "T EACH <br />26~5- <br /> 3 EACH <br /> LF <br /> <br />3045 <br /> <br />53 <br /> <br /> 63 i4,' DOUBLE LINE BROKEN & SOLID YELLOW - EPOX~ 515 <br /> <br />] ;4 24" SOLID LINE WHITE- EPOXY I 4;- <br />65 i4" SO'LtD LINE WHITE- PAINT I e75, <br /> 86 4" OOUBLE LINE BROKEN & SOLID YELLOW- PAtH! 515 <br /> 67 iNsTALL 4"- 6" PVC fSCH4~ CONDU T 800 <br /> 88 BALE CHECK 50 <br /> 69 !SILT FENCE TYPE MACHINE SLICED 6000 <br /> <br />$ lO0.00 <br /> <br />$ 3.00 <br /> <br />$ 14.00 <br /> <br />$ 8.00 <br /> <br />Contract Price <br /> <br />$ 3,100.00 <br /> <br />$ 7,500.00 <br /> <br />$ 10,920.00 <br /> <br />$ 45,800.00 <br /> <br />Usedto <br />Date <br /> <br />25 <br /> <br />2,416 <br /> <br />490 <br /> <br />5883 <br /> <br />Extension <br /> <br />$ 2,5o0.00 <br /> <br />$ 7,248.00 <br /> <br />$ 8,860.00 <br /> <br />$ 47,084.00 <br /> <br />LF $ 17.00 $ 2,244.00 $ <br />SF $ 3,90 1850 $ 7,215.00 <br />EACH 2 $ 720,00 <br /> <br /> $ 9,555.00 <br />360.00t 720.00 <br /> <br /> 4.00 $ 356,00 <br /> <br /> 5.00 $ 890.00 <br /> <br />28.00 I$ 861.00 <br /> <br />$ 750.00 <br /> <br />$ 245.00 <br /> <br />$ 750.00 <br /> <br />$ 980.00 <br /> <br />$ 400.00 <br /> <br />$ 825.00 <br /> <br />26.,45 <br /> <br />$ 1,522.50 <br /> <br />$ 272.95 <br /> <br />$ 257.50 <br /> <br />$ 226.60 <br /> <br />$ 1,016.50 <br /> <br />$ 195.'70 <br /> <br />$ 1,800.00 <br /> <br />$ lOO,OO <br /> <br />$ 275.00 <br /> <br />$ 0.01 <br /> <br />LF $ 0.50 <br />LF $ 5.!5 <br /> <br />LF I $ 0.50 <br /> <br />300 <br /> <br />LF I $ 5.15 <br /> <br />0.38 <br />0.38 <br />3.00 <br />10.00 <br />1.65 <br />750.00 <br /> <br />LF <br /> <br />LF <br /> <br />LF <br /> <br />$ 750.00 <br /> <br />$ 900.00 <br /> <br />EACH $ 500.00 $ <br />LF $ 9,900.00 844 $ 1,392.60 <br />EACH $ 1,500.00 2 $ 1,500.00 <br />ACRE I$ 500.00 $ 1,000.00 0.8 $ 400.00 <br /> <br /> LB I $ 2.20 $ 440.00 80 $ 176.00 <br /> TON $ 145.00 $ 580.00 %6 $ 232.00 <br /> SY $ 1.70 $ 81800.00 $ <br /> '280 $ 112.00 <br /> <br />7,0. ITEMPORARY CONSTRUCTION ROCK ENTRANCE <br /> <br />71 jSEEDING <br /> <br />72 JSEED MIXTURE 260 <br />73 IMULCH MATERIAL TYPE 3 <br />74 [EROSION CONTROL BLANKETS CATEGORY 3 <br /> <br />75 1COMMERCIAL FERTILIZER ANALYSIS 24-2-24 <br /> <br /> 2 <br /> <br /> 2.0 <br /> <br />' 4000 <br /> 700 <br /> <br />LBS <br /> <br />0.40 <br /> <br />$ 280.00 <br /> <br />Total Bid Schedule "A" - Street Construction <br /> <br />SUMMARY OF BIDDING <br /> <br />Bid Schedule "A", Street Construction <br />Base Bid Total <br /> <br />TOTAL <br /> <br />LESS 5% RETAINAGE <br /> <br />LESS PAY ESTIMATE #1 <br /> <br />LESS PAY ESTIMATE #2. <br />LESS PAY ESTIMATE #3 <br />LESS PAY ESTIMATE #4 <br />WE RECOMMEND PAYMENT OF: <br /> <br />APPROVALS: <br /> <br />CONTRACTOR: W.B. MILLER, INC, <br /> Cediflcation by ~qtor: I ce?try that all items and amounts are correct for the work completed to date. <br />Signed:/~~~'~-''' <br /> Date /4r/' /'~/' ~' [' <br />TiUe: /2-? __ <br /> <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES1 INC. <br /> Certific~ Eng_~er: ~__~o~ayment for work and quantities as shown. <br /> <br />562,023.30 <br /> <br />562,023.30 <br />562,023.3O <br /> <br />562,023.30 <br /> <br />450,664.00 <br /> <br />450,664.00 <br />450,664.00 <br /> <br />450,664.00 <br />22,533.20 <br />171,141.55 <br />82,878.98 <br />82,307.05 <br />88,319.60 <br />23,483.62 <br /> <br /> <br />