My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/25/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 10/25/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:57:42 PM
Creation date
10/24/2005 11:45:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/25/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE #: ~} <br /> <br />REQUEST FOR PRELIMINARY E,[AT AND PRELIMINARY SITE PLAN <br /> REVIEW FOR SUMMERSET MEADOWS <br /> CASE OF PULTE HOMES <br /> By: Patrick Trudgeon, AICP Community Development Director <br /> <br />Background: <br /> <br />The Ciw is in receipt of a preliminary plat submitted by Pulte Homes to develop a residential <br />development named Summerset Meadows. Puke Homes is proposing to develop a total of 606 <br />housing units on 187 acres. The subject property is located north of Highway #10, west of <br />Armstrong Blvd., and south of Alpine Drive. <br /> <br />The t'oll{~wing items are enclosed for your information: <br /> <br />a) Sire Location Map <br />b) Preliminary Plat Submittal (Booklet Was 'sent to the City Council on October. 7) <br />c) Environmental Assessment Worksheet <br />d) ?lanning Commission Meeting Minutes dated March 10, 2005 <br />e) City Council Meeting Minutes dated March 22, 2005 <br />f) City Staff Review Letter dated September 30, 2005, Revised October 21, 2005 <br />g) ?roposed Preliminary Plat Resolution <br /> <br />Observations: <br /> <br />'In March, 2005, the Planning Commission reviewed the sketch plan for this development. The <br /> sketch plan showed approximately. 785 units. Pulte Homes has removed the 175 apartment units <br /> si~own on the sketch plan at this time. They 'may bring back a future development the will <br /> contain apartments in the future, but at this time it is undetermined if and when that would <br /> happen. <br /> <br />As part of the approval process, an Environmental Assessment Worksheet (EAW) was required. <br />On July 26, 2005, after review of the comments received from the documents and looking at <br />i~formafion contained within the EAW, the City Council determined that no further <br />environmental review was necessary. <br /> <br />7'he preliminary plat covers an area Of 187 acres. Puke Homes is proposing to develop 606 <br />housir, 5 units on 136 acres of the site. As part of the plat, the developer is creating outlots that <br />may contain commercial development on _38.5 acres. They are also reserving a 300-foot wide <br />corridor needed for the future Mississippi River Bridge Crossing. This corridor is nearly 14 acres <br />[~ size. The residential portion of the development will consist of 154 smalMot single family <br />~omcs. 274 village row townhOmes, and 178 court home (back-to-back) town_homes. The plat <br />also dedicates 4.26 acres as a public park and creates a 2.23 acre home owners association park <br />r[am will contain a pool, tem~is and basketball courts, and a clubhouse.- <br /> <br />~J'he property currently has several zoning designations, R-l, R~2, R-3, and TC-2. Pulte Homes ~S <br />?rot3osin5 to rezone the entire property to Planned Unit Development (PUD). The current zoning <br />district locations are shown on Page 5 of 35.0fthe Engineering Plans. Given the fact that that <br />a~ppiic::mt is planning to reserve some land for possible commercial development, Staff <br /> <br />-197- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.