Laserfiche WebLink
:,;., :. ::.; .... <br /> <br />If the project may cause any adverse environmental impacts not addressed by items 'I to <br />28, identify and discuss them here, along with any proposed mitigation. <br /> This project is not believed to cause any anticipated adverse environmental impacts that have not been addressed by <br /> this <br /> <br />Do not complete this section if the EAW is being done for ElS scoping.; instead, address <br />relevant issues in the dra~ Scoping Decision document, which must accompany the <br />EAW. List any impacts and issues identified above ~hat may require fu~her.investigation <br />before the project is begun. Discuss any alternatives or mitigative measures that have <br />been or may be considered for these impacts and issues, including those that have been <br />or may be ordered as permit conditions. . 9. Fish, Wildlife and Ecologically Sensitive Reso~ces' <br /> The main impact urbanization h~ on plants and animals are ~6m a loss of habitat. ~other way that urbanization <br /> can affect wildlife is by ~a~enting the natural habitat are~. Wildlife will be displaced due to the lo~ of habitat <br /> and t?om noise and activity ~om construction. The wil~ife will likely relocate to other he,by habitat. Some of the <br /> wildlitb [hat leave due to construction of the development may ream once it is complete. Some of the wildlife will <br /> be permanently displaced due to habitat change ~d stress Eom the new development. <br /> 16. Erosion and Sedimentation <br /> The area to be disturbed by the project is 190 acres through the excavation of 600,000 cubic yar~ ofmatehal. <br /> An Erosion and Sediment Control Plan and a Sto~ Water Pollution Prevention Pro,am (swPPP) will be <br /> submitted and approved ~ required by the pe~iging agencies. <br /> MPCA Best Management Practices (BMP) will be implemented m ~figate erosion and sediment, which are <br /> required for all land disturbances. Grading will be limitgg to ro~way construction, sto~ water ponds, and ho~e <br /> pads. B~s to be implemented include silt fences, sto~ water b~ins, rock co~truchon enhances, ~d seeding <br /> disturbed slopes, ~d will be implemented ~ soon ~ possible. The developer will obtain a National Polluter <br /> Discharge Elimination Sysmm (NPDES) pe~it ~d comply with the reqmrements. <br /> 21. Traffic <br /> An incre~e in traffic flow will be generated in this ~ea due to residenti~ development. <br /> <br />-213- <br /> <br /> <br />