My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/21/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 06/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:37:35 AM
Creation date
6/20/2022 3:24:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Since collecting topo survey data, Engineering Staff explored drainage improvement options within this <br />neighborhood and have determined that the most feasible and cost-effective improvement project would be to <br />construct a storm sewer pipe with manholes and ditch inlets along one side of Argon Street, and to outlet the storm <br />sewer into the existing stormwater pond south of Alpine Drive between Argon and Barium Streets. <br />A recommendation is now being requested from the Public Works Committee as to whether the City Council <br />should authorize Staff to prepare plans and specifications for a 2022 drainage improvement project along Argon <br />Street. If the Committee recommends City Council approval, Staff will present a case to Council on June 28, 2022, <br />seeking Council authorization to prepare plans and specifications. <br />Timeframe: <br />Staff anticipates 20 minutes will be required to present this case and respond to questions. <br />Observations/Alternatives: <br />Observations: <br />Mr. Dan Ridgeway, property owner at 15410 Argon Street, plans to attend this meeting, as do one or more <br />neighbors. <br />Figure 1 shows 2-foot contours across the broader neighborhood area. <br />Figure 2 shows 2-foot contours, addresses and aerial images along Argon Street. <br />Alternatives: <br />Alternative #1 — Motion recommending City Council authorization to prepare plans and specifications for 2022 <br />Argon Street Drainage Improvements. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Staff will prepare plans and specifications as part of their normal duties. <br />A detailed construction cost estimate will be developed based on the plans prepared by Staff, but as of today Staff <br />estimates project costs will range between $325,000 and $500,000. <br />Recommendation: <br />Staff recommends approving Alternative # 1. <br />Action: <br />Dependent on discussions. <br />Attachments <br />Halland Acres Plat <br />Figure 1 <br />Figure 2 <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 06/16/2022 02:21 PM <br />Brian Hagen Brian Hagen 06/16/2022 02:53 PM <br />Form Started By: Bruce Westby Started On: 06/14/2022 04:04 PM <br />Final Approval Date: 06/16/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.