Laserfiche WebLink
Alternative 1: 2 Lane Road, Standard 6' Boulevard, Standard 10' Off -Street Trail <br />• 28-foot wide road (12' travel lanes, 2' curb reactions) <br />o Shift the road 1-foot south (existing road is 29 feet wide) <br />• Central Park Impacts <br />o Removal of 38 of 39 trees in the boulevard area <br />• PACT / Church Boulevard Impacts <br />o Estimated Removal of 55 trees in the boulevard area <br />o Root Impact of 4 trees in the boulevard area <br />• Existing Properties on south side of 161 St Avenue <br />o Standard impacts to driveways and grading to add new curb and gutter and storm sewer <br />o No anticipated impacts to trees <br />Alternative 2: 2 Lane Road, No Boulevard, 12' Off -Street Trail behind curb <br />• 28-foot wide road (12' travel lanes, 2' curb reactions) <br />o Shift the road 1-foot south (existing road is 29 feet wide) <br />0 12' Trail includes 10-foot standard trail plus required 2-foot clear zone area <br />• Central Park Impacts <br />o Removal of 14 trees in the boulevard area <br />o Root Impact of 24 trees in the boulevard area <br />• PACT / Church Boulevard Impacts <br />o Estimated Removal of 23 trees in the boulevard area <br />o Root Impact of 35 trees in the boulevard area <br />• Existing Properties on south side of 161st Avenue <br />o Standard impacts to driveways and grading to add new curb and gutter and storm sewer <br />o No anticipated impacts to trees <br />Alternative 3: 2 Lane Road, 10' Off -Street Trail between trees and ball fields <br />• 28 feet wide road (12' travel lanes, 2' curb reactions) <br />o Trail placed 3 feet south of the foul poles and south of lighting <br />• Moving trail further north would require moving foul poles and lights <br />• Fields would have to move to maintain 300-foot ball field dimensions <br />• Central Park Impacts <br />o Removal of 13 trees in the boulevard area <br />o Root Impact of 12 trees in the boulevard area <br />o Avoided Impact to 14 trees in the boulevard area <br />• PACT / Church Boulevard Impacts <br />o Potentially avoids impacts to boulevard trees <br />• Dependent on layout of school and future church properties <br />• Existing Properties on south side of 161st Avenue <br />o Standard impacts to driveways and grading to add new curb and gutter and storm sewer <br />o No anticipated impacts to trees <br />Alternative 4: On Road Bike Lanes <br />• 36 feet wide (12' travel lanes, 6' bike lanes each side) <br />o Widens road by 7 feet <br />o No additional off-street facilities <br />• Central Park Impacts <br />o Between Armstrong Boulevard and East Park Entrance <br />• Removal of minimum 2 trees <br />. Root Impact of 16 trees <br />o Between East Park Entrance and East Property Line <br />