Laserfiche WebLink
An alternative "reclamation light" project design has been discussed as a way to gain useful life out of the streets. <br />The design process would include reclamation of the existing bituminous and aggregate base, removal of 2-inches <br />of reclamation material and placement of 2-inches new bituminous pavement. This would leave a pavement section <br />of 2-inches bituminous pavement over approximately 5-inches recycled aggregate base. The intent of this process <br />would be to avoid any restoration needs of the boulevards and adjacent driveways. Staff performed an estimate for <br />this process, with the total project costs, including 10-percent contingency costs and 23-percent indirect costs, of <br />5630,OOO. This is approximately 43-percent of the estimated cost of the proposed street reconstruction. <br />Alternatives: <br />Alternative #1— Motion recommending City Council approving plans and specifications and authorizing <br />advertisement for bids for Autumn Heights Street Reconstructions, Improvement Project #22-02. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Stormwater Utility <br />Funds. <br />Staff has completed an estimate based on the final plans and anticipated 2022 construction costs, with a total <br />estimated project cost of $1,475,337.15, which includes 23-percent indirect costs for administrative, engineering, <br />finance, and legal costs. <br />• Street Project Costs $1,379,587.80 <br />• Storm Sewer Project Costs $95,749.35 <br />• Total Estimated Costs $1,475,337.15 <br />Recommendation: <br />Staff recommends Alternative #1 to maintain a consistent pavement design on all recently reconstructed streets. <br />Alternatively, the Committee could recommend revising the plans to include the "reclamation light" design at an <br />estimated 43-percent cost savings. However, these streets would then have a different design than all other recently <br />reconstructed streets in Ramsey, which would provide a lesser pavement design strength and a shorter design life. <br />Action: <br />Motion recommending City Council approving plans and specifications and authorizing advertisement for bids for <br />Autumn Heights Street Reconstructions, Improvement Project #22-02. <br />Attachments <br />22-02 Title Sheet <br />22-02 Street Summary <br />22-02 Project Scope <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 06/16/2022 10:08 AM <br />Grant Riemer Grant Riemer 06/16/2022 10:31 AM <br />Brian Hagen Brian Hagen 06/16/2022 02:53 PM <br />Form Started By: Joe Feriancek Started On: 06/14/2022 08:22 AM <br />Final Approval Date: 06/16/2022 <br />