Laserfiche WebLink
Josh Nyquist,Executive Director of Building Operations May 26,2022 <br /> PACT Charter School I Traffic Impact Study Page 7 <br /> Table 3. Existing Weekday Conditions Peak Hour Traffic Operations/Capacity Analysis <br /> A.M. Peak Hour Dismissal Peak Hour P.M. Peak Hour <br /> Study Intersection <br /> LOS Delay Queue LOS Delay Queue LOS Delay Queue <br /> Variolite Street/173rd Avenue(1) A/A 9 sec. NB/1 A/A 9 sec. NB/1 A/A 10 sec. NB/1 <br /> Variolite Street/161st Avenue(1) A/A 10 sec. WB/1 A/A 10 sec. EB/1 A/A 10 sec. EB/1 <br /> Variolite Street/Alpine Drive(1) A/B 11 sec. SB/1 A/A 10 sec. SB/1 A/B 11 sec. SB/1 <br /> Armstrong Boulevard/161st Avenue(1) A/B 11 sec. EB/1 A/B 12 sec. WB/1 A/B 15 sec. WB/1 <br /> Armstrong Boulevard/Alpine Drive(1) A/C 18 sec. WB/2 A/C 16 sec. WB/2 A/E 45 sec. WB/4 <br /> Armstrong Boulevard/Alpine Drive(3) A/A 6 sec. EB/1 A/A 6 sec. NB/1 A/A 9 sec. NB/3 <br /> Ramsey Boulevard/Alpine Drive(2) B/B 12 sec. SB/2 A/B 11 sec. NB/1 B/B 13 sec NB/2 <br /> 175th Avenue/Nowthen Boulevard (1) A/B 13 sec. EB/1 A/B 12 sec. EB/1 A/B 13 sec. EB/1 <br /> (1) Indicates a side-street stop-controlled intersection, where the overall LOS is shown followed by the worst approach LOS.The delay shown represents the <br /> worst side-street approach average delay per vehicle.The queue shown is the 95th percentile queue(in vehicles)for the worst approach at the intersection. <br /> The 95th percentile queues shown in red bold font spill back to and beyond the adjacent upstream intersection. <br /> (2) Indicates an all-way stop-controlled intersection,where the overall LOS and average delay per vehicle are shown.The queue shown is the 95th percentile <br /> queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font spill back to and beyond the <br /> adjacent upstream intersection. <br /> (3) Indicates an improvement to provide a single-lane roundabout intersection,where the overall LOS and average delay per vehicle are shown.The queue <br /> shown is the 95th percentile queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font <br /> spill back to and beyond the adjacent upstream intersection. <br /> Year 2028 No-Build Conditions <br /> To understand how the existing transportation system and general background growth are expected <br /> to impact the study intersections, year 2028 no-build conditions were reviewed (no proposed PACT <br /> Charter School site-generated traffic is included in this scenario). Note that year 2028 represents the <br /> year where the PACT Charter School can be assumed to be completed with full occupancy of the <br /> proposed development and includes all phases of the proposed PACT Charter School project plus <br /> completion of the adjacent future proposed St. Katharine Drexel Church. <br /> Background Growth <br /> To account for general background traffic growth within the study area, a conservative annual growth <br /> rate of one (1)percent was applied to the existing peak hour volumes to develop year 2028 background <br /> traffic forecasts. <br /> Intersection Capacity Analysis <br /> To determine how the adjacent roadway network will accommodate the year 2028 no-build traffic <br /> volumes, an intersection capacity analysis was completed using Synchro/SimTraffic Software. 2028 <br /> no-build traffic forecasts,which include general background growth, are shown in Figures 3A and 3B. <br />