My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/23/2022
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2022
>
Agenda - Planning Commission - 06/23/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:11:32 AM
Creation date
6/24/2022 8:53:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Josh Nyquist,Executive Director of Building Operations May 26,2022 <br /> PACT Charter School I Traffic Impact Study Page 10 <br /> Results of the year 2028 no-build intersection capacity analysis shown in Table 4,indicate that all study <br /> intersections are expected to continue to operate at an acceptable overall LOS B or better during the <br /> peak hours under existing traffic control and intersection geometrics. No significant queuing or delay <br /> issues were identified, except for the Armstrong Boulevard/Alpine Drive intersection where the <br /> westbound approach would now operate at a LOS F during the p.m. peak hour (note: no proposed <br /> PACT Charter School site-generated traffic is included in this scenario). The future conversion of <br /> Armstrong Boulevard/Alpine Drive to a single-lane roundabout will improve operations and all <br /> approaches will operate at a LOS A during the peak hours. <br /> Table 4. Year 2028 Weekday No-Build Conditions Peak Hour Traffic Operations/Capacity Analysis <br /> A.M. Peak Hour Dismissal Peak Hour P.M. Peak Hour <br /> Study Intersection <br /> LOS Delay Queue LOS Delay Queue LOS Delay Queue <br /> Variolite Street/173rd Avenue(1) A/A 9 sec. NB/1 A/A 9 sec. NB/1 A/A 10 sec. NB/1 <br /> Variolite Street/161st Avenue 01> A/A 10 sec. WB/1 A/A 10 sec. EB/1 A/A 10 sec. EB/1 <br /> Variolite Street/Alpine Drive(1) A/B 11 sec. SB/1 A/A 10 sec. SB/1 A/B 11 sec. SB/1 <br /> Armstrong Boulevard/161st Avenue(1) A/B 11 sec. EB/1 A/B 13 sec. WB/1 A/B 15 sec. WB/1 <br /> Armstrong Boulevard/Alpine Drive(1) A/C 19 sec. WB/ A/C 17 sec. WB/2 VF 60 sec. WB/6 <br /> Armstrong Boulevard/Alpine Drive(3) A/A 6 sec. EB/1 A/A 6 sec. NB/1 A/A 9 sec. NB/3 <br /> Ramsey Boulevard/Alpine Drive(2) B/B 12 sec. SB/2 A/B 11 sec. NB/2 3/B 13 sec. NB/2 <br /> 175th Avenue/Nowthen Boulevard (1) A/B 14 sec. EB/1 A/B 12 see. EB/1 A/B 14 sec. EB/1 <br /> (1) Indicates a side-street stop-controlled intersection,where the overall LOS is shown followed by the worst approach LOS.The delay shown represents the <br /> worst side-street approach average delay per vehicle.The queue shown is the 95th percentile queue(in vehicles)for the worst approach at the intersection. <br /> The 95th percentile queues shown in red bold font spill back to and beyond the adjacent upstream intersection. <br /> (2) Indicates an all-way stop-controlled intersection,where the overall LOS and average delay per vehicle are shown.The queue shown is the 95th percentile <br /> queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font spill back to and beyond the <br /> adjacent upstream intersection. <br /> (3) Indicates an improvement to provide a single-lane roundabout intersection,where the overall LOS and average delay per vehicle are shown.The queue <br /> shown is the 95th percentile queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font <br /> spill back to and beyond the adjacent upstream intersection. <br /> Proposed Development <br /> The site of the proposed PACT Charter School development is generally located north of 161 st <br /> Avenue and roughly 0.25 miles east of Armstrong Boulevard (see Figure 1). It was assumed that the <br /> construction of the proposed development would be completed and fully occupied by year 2028. <br /> Access to the proposed site would be provided at two site access locations on 161 st Street: a primary <br /> (east) site access approximately 600 feet west of Variolite Street (buses, pick-up/drop-off, stafo and a <br /> secondary (west) site access approximately 1,150 feet west of Variolite Street (buses, student drivers). <br /> PACT Charter School is proposing to acquire approximately 18 acres of a larger 33-acre vacant land <br /> parcel located at 7633 161 st Avenue NW in the City of Ramsey,with the intent to build a new charter <br /> school facility, approximately 115,000 square feet in size. This new facility will be designed to <br /> accommodate grades six through twelve. The schools existing campus will then be home to <br /> kindergarten through fifth grades. Minor interior renovations are being planned at their existing <br /> building to better accommodate these lower grade levels. The seller is the Church of St. Katharine <br /> Drexel and they plan to retain the remaining approximately 15 acres for a future church development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.