My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 06/28/2022
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2022
>
Agenda - Council Work Session - 06/28/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:33:49 PM
Creation date
6/24/2022 3:37:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
06/28/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rating pavement surface condition 15 <br /> Rating system <br /> Surface rating Visible distress . . . <br /> treatment measures <br /> 10 None. New construction. <br /> Excellent <br /> 9 None. Recent overlay. Like new. <br /> Excellent <br /> No longitudinal cracks except reflection of paving joints. Recent sealcoat or new cold mix. <br /> 8 Occasional transverse cracks, widely spaced (40' or greater). Little or no maintenance <br /> Very Good All cracks sealed or tight(open less than 1/41.). required. <br /> Very slight or no raveling, surface shows some traffic wear. First signs of aging. Maintain <br /> 7 Longitudinal cracks(open I/4") due to reflection or paving joints. with routine crack filling. <br /> Good Transverse cracks (open 1/4") spaced 10' or more apart, little or slight <br /> crack raveling. No patching or very few patches in excellent condition. <br /> Slight raveling (loss of fines)and traffic wear. Shows signs of aging. Sound <br /> 6 Longitudinal cracks(open 1/4"-1/2"), some spaced less than 10'. structural condition. Could <br /> Good First sign of block cracking. Sight to moderate flushing or polishing. extend life with sealcoat. <br /> Occasional patching in good condition. <br /> Moderate to severe raveling (loss of fine and coarse aggregate). Surface aging. Sound structural <br /> 5 Longitudinal and transverse cracks(open 1/2") show first signs of condition. Needs sealcoat or <br /> slight raveling and secondary cracks. First signs of longitudinal cracks thin non-structural overlay(less <br /> Fair near pavement edge. Block cracking up to 50% of surface. Extensive than 2") <br /> to severe flushing or polishing. Some patching or edge wedging in <br /> good condition. <br /> Severe surface raveling. Multiple longitudinal and transverse cracking Significant aging and first signs <br /> 4 with slight raveling. Longitudinal cracking in wheel path. Block of need for strengthening. Would <br /> Fair cracking (over 50% of surface). Patching in fair condition. benefit from a structural overlay <br /> Slight rutting or distortions(1/2 deep or less). (211or more). <br /> 3 Closely spaced longitudinal and transverse cracks often showing Needs patching and repair prior <br /> raveling and crack erosion. Severe block cracking. Some alligator to overlay. Milling and <br /> Poor cracking (less than 25% of surface). Patches in fair to poor condition. removal of deterioration extends <br /> Moderate rutting or distortion (1 if or 2" deep). Occasional potholes. the life of overlay. <br /> 2 Alligator cracking (over 25% of surface). Severe deterioration. Needs <br /> Severe distortions(over 2" deep) reconstruction with extensive <br /> Very Poor Extensive patching in poor condition. base repair. Pulverization of old <br /> Potholes. pavement is effective. <br /> 1 Severe distress with extensive loss of surface integrity. Failed. Needs total <br /> Failed reconstruction. <br /> Individual pavements will not have all of the types of distress listed for any particular rating. They may have only one or two types. <br />
The URL can be used to link to this page
Your browser does not support the video tag.