My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/14/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 06/14/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:32:40 PM
Creation date
6/28/2022 9:17:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/14/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 18. <br /> Meeting Date: 06/14/2022 <br /> Submitted For: Joe Feriancek, Engineering/Public Works <br /> By: Joe Feriancek, Engineering/Public Works <br /> Information <br /> Title <br /> Adopt Resolution#22-130 Accepting Survey Proposals for 167th Avenue Reconstruction, Improvement Project <br /> #23-04 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-130 accepting survey proposals for 167th Avenue <br /> Reconstruction, Improvement Project#23-04. <br /> Background: <br /> The current 2022—2031 10-Year Capital Improvement Plan(CIP)proposes the reconstruction of 167th Avenue <br /> between Nowthen Boulevard and Trunk Highway 47 in 2023. Topographic surveys are essential to locate all <br /> existing site features and to create an existing ground surface,used as the base for designing the project. <br /> Quotes received with the survey proposal are shown below. <br /> TOPOGRAPHIC SURVEYS <br /> Project Bolton & Menk,Inc. Hakanson Anderson <br /> 167th Avenue Reconstruction 1$51800.00 $61300.00 <br /> Bolton&Menk, Inc. submitted the lowest total responsible quote. Based on the submitted quotes, Staff <br /> recommends accepting the proposal for topographic survey from Bolton&Menk. <br /> Bolton&Menk is required to complete their work by July 29, 2022,which will allow Staff to begin design work for <br /> these proposed improvements, after City Council authorization. <br /> The next step in the project process will be to gather more design information, including geotechnical reports, and <br /> utility testing for the municipal utilities within the project area. After initial review of the information, Staff is <br /> proposing to present a case to City Council at a future meeting to discuss ordering of plans and specifications for <br /> these improvement projects. At that time Staff will be able to provide a more thorough project scope and estimated <br /> project costs. Funding sources for this project are proposed to be from Municipal State Aid(MSA)Funds and <br /> Stormwater Utility Funds. <br /> Notification: <br /> If City Council awards a contract for topographic services, City Staff will send notification letters to residents in the <br /> impacted area to provide notice that surveyors will be collecting survey data for the proposed project, information <br /> on the scope of services being provided at this time, a link to the project web page where additional information on <br /> this proposed project can be found, and contact information should people have questions about the proposed <br /> proj ect. <br /> Observations/Alternatives: <br /> Motion to adopt Resolution#22-130 accepting survey proposals for 167th Avenue Reconstruction, Improvement <br /> Project#23-04. <br />
The URL can be used to link to this page
Your browser does not support the video tag.