Laserfiche WebLink
ALL OFF -ROAD TRAIL <br />Base Trail <br />Special Slope Areas <br />Fill Behind Guardrail <br />Culvert Extension or Small Bridge <br />Curb & Gutter w/ Wall <br />Wetland Banking Credits <br />Subtotal <br />Mobilization <br />Traffic Control <br />Total Construction Estimate <br />Length <br />Cost per LF Check <br />Administrative (Low) <br />Administrative (High) <br />Armstrong Boulevard Trail <br />Length/Area <br />Unit Price <br />Cost <br />6100 <br />$45.00 <br />$274,500.00 <br />1865 <br />$100.00 <br />$186,500.00 Areas where retaining walls or C & G may be required. <br />480 <br />$100.00 <br />$48,000.00 Assumes use of on -site materials. <br />50 <br />$200.00 <br />$10,000.00 May increase based on type of bridge used. <br />800 <br />$150.00 <br />$120,000.00 Intense slope issues. Multiple methods required. <br />1.5 <br />$50,000.00 <br />$75,000.00 Purchase of credits. Assume 2:1 purchase to impact ratio. <br />$714,000.00 <br />ON -ROAD FROM MARMOSET STREET TO 167TH LANE <br />Base Trail <br />Special Slope Areas <br />Fill Behind Guardrail <br />Culvert Extension or Small Bridge <br />Curb & Gutter w/ Wall <br />Wetland Banking Credits <br />On -Road Striping <br />Crossings <br />Subtotal <br />Mobilization <br />Traffic Control <br />Total Estimate <br />Length <br />Cost per LF Check <br />Administrative (Low) <br />Administrative (High) <br />8.00% $57,120.00 <br />3.00% $21,420.00 <br />$792,540.00 <br />6,100 <br />$129.92 <br />$118,881.00 15 Percent for a locally funded trail <br />$198,135.00 25 Percent for a federally funded trail <br />Length/Area <br />Unit Price <br />Cost <br />6100 <br />$45.00 <br />$274,500.00 <br />1250 <br />$100.00 <br />$125,000.00 Areas where retaining walls or C & G may be required. <br />0 <br />$100.00 <br />$0.00 <br />0 <br />$200.00 <br />$0.00 <br />0 <br />$150.00 <br />$0.00 <br />0 <br />$50,000.00 <br />$0.00 <br />1895 <br />$15.00 <br />$28,425.00 <br />2 <br />$2,500.00 <br />$5,000.00 Pavement markings and signage only. No flashers. <br />$432,925.00 <br />8.00% $34,634.00 <br />3.00% $12,987.75 <br />$480,546.75 <br />6,100 <br />$78.78 <br />$72,082.01 15 Percent for a locally funded trail <br />$120,136.69 25 Percent for a federally funded trail <br />Base Trail Cost: $45/LF. Includes grading, CL5, bituminous, restoration, seeding. <br />Retaining walls: Assume $25/SF above ground (exposed surface). <br />Boardwalk or Bridge: $200/LF <br />Culvert Extensions: $100/LF to $200/LF, depending on size <br />On Road: $15/LF for striping and signage <br />Curb and Gutter: $100/1-F. Includes bituminous patching in front of curb and drainage pipe and structures. <br />Wetland Replacement: $50,000/Acre <br />Mobilization: 8% <br />Traffic control: 3% <br />