My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/12/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 07/12/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:34:08 PM
Creation date
7/12/2022 9:10:31 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/12/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1050030 <br /> which the storm sewer facilities were designed, without first obtaining written permission to do so from <br /> the other party. <br /> 6. Basis of State Cost <br /> 6.1. Schedule Y'. The Preliminary Schedule "I" includes all anticipated State participation construction items <br /> and the construction engineering cost share covered under this Agreement. <br /> 6.2. State Participation Construction. The State will participate in the following at the percentages indicated. <br /> The construction includes the State's proportionate share of item costs for Mobilization and Traffic <br /> Control. <br /> A. 100 Percent will be the State's rate of cost participation in all of the SP 0202-121 TH 10 Access Closure <br /> construction, up to the capped amount.The construction includes, but is not limited to, those <br /> construction items tabulated on Sheet Nos. 2 and 3 of the Preliminary Schedule "I".This will be a lump <br /> sum amount based on contractor bid prices. <br /> B. 100 Percent will be the State's rate of cost participation in all of the SP 0202-121 and SAP 199-115-005 <br /> Riverdale Drive construction, up to the capped amount.The construction includes, but is not limited to, <br /> those construction items tabulated on Sheet Nos.4 and 5 of the Preliminary Schedule "I".This will be a <br /> lump sum amount based on contractor bid prices. <br /> C. 100 Percent will be the State's rate of cost participation in all of the SP 0202-121 TH 10 Cable Barrier <br /> construction.The construction includes, but is not limited to,those construction items tabulated on <br /> Sheet No. 5 of the Preliminary Schedule "I". <br /> 6.3. Construction Engineering Costs. The State will pay a construction engineering charge equal to 8 percent of <br /> the total State participation construction covered under this Agreement. <br /> 6.4. Capped State Funds. The State funds available for the SP 0202-121 TH 10 Access Closure and SP 0202-121 <br /> and SAP 199-115-005 Riverdale Drive construction are capped at$612,000.00. <br /> 6.5. Addenda, Change Orders,Supplemental Agreements, and Work Orders.The State will share in the costs <br /> of construction contract addenda, change orders, supplemental agreements, and work orders that are <br /> necessary to complete the State participation construction covered under this Agreement and are <br /> approved in writing by the State District Engineer's authorized representative. <br /> 6.6. Liquidated Damages. All liquidated damages assessed the City's contractor in connection with the <br /> construction contract will result in a credit shared by each party in the same proportion as their total <br /> construction cost share covered under this Agreement is to the total contract construction cost before any <br /> deduction for liquidated damages. <br /> 7. State Cost and Payment by the State <br /> 7.1. State Cost. $735,103.68 is the State's estimated share of the costs of the contract construction which <br /> includes the construction engineering cost share and a contingency amount as shown in the Preliminary <br /> Schedule "I". The Preliminary Schedule "I" was prepared using estimated quantities and unit prices, and <br /> may include any credits or lump sum costs. Upon review of the construction contract bid documents <br /> described in Article 3.2,the State will decide whether to concur in the City's award of the construction <br /> contract and, if so, prepare a Revised Schedule "I" based on construction contract unit prices, which will <br /> replace and supersede the Preliminary Schedule "I" as part of this Agreement.The contingency amount is <br /> provided to cover the cost difference between the Preliminary Schedule "I" and the Revised Schedule "I", <br /> overruns of the plans estimated quantities of State participation construction, and State approved <br /> additional construction including construction engineering costs. <br /> -6- <br /> Payable Standard (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.