Laserfiche WebLink
PERSONNEL COMPLEMENT <br /> Public Works Superintendent 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Secretary(Formerly under Engineering) 1.00 1.00 1.00 1.00 1.00 1.00 <br /> Mechanic 2.00 2.00 2.00 2.00 2.00 2.00 <br /> Street Supervisor - - - - 1.00 1.00 <br /> Streets Lead Worker 1.00 1.00 1.00 1.00 1.00 1.00 <br /> PW Maintenance Worker 4.00 5.00 5.00 5.00 4.00 5.00 <br /> Temporary-Streets 0.50 0.50 0.50 0.50 0.50 0.50 <br /> Street Maintenance Total 9.50 10.50 10.50 10.50 10.50 11.50 <br /> 6488/6489 Other Contracted Services <br /> Pavement Management Program Funding(Transfer to Pavement Management Fund) 2601742 300,000 - - <br /> Cracksealing/Rejuvenation 237,483 237,483 239,258 162,784 200,000 200,000 <br /> Curb Repair/Tree Removal - - 15,000 15,000 <br /> 237,483 237,483 500,000 462,784 215,000 215,000 <br /> 6540-Heavy Machinery <br /> F350 truck with plow 197,061 - - 116,891 <br /> 1-Ton Truck 37,577 - - - <br /> Sidewalk Machine 148,292 - - <br /> Tractor Backhoe($84,000 total remainder utility funded) 37,688 - - <br /> Tandem Axle Truck with Plow - - - - 265,800 270,950 <br /> 234,638 185,980 - 116,891 265,800 270,950 <br /> 6550-Motor Vehicle <br /> 1-ton truck - 62,772 <br /> 2-3/4 ton trucks with plows(1 new&1 replacement) - - - - - 133,852 <br /> - - - 62,772 - 133,852 <br /> 6580-Other Equipment <br /> Sidewalk Machine - - - 162,723 <br /> Snow Pusher Box for Front End Loader 18,855 <br /> Trailer for skidsteer - - - 15,102 <br /> Toolcat 36,105 <br /> Skidsteer - - - 57,372 <br /> ATV Athletic Field Maintenance Machine 14,032 14,032 - - <br /> 14,032 14,032 - 271,302 - 18,855 <br /> DESCRIPTION OF SERVICES: <br /> The Street Maintenance Department is responsible for maintaining city streets,sidewalks,traffic signs,boulevards,ROW <br /> mowing and the storm water collection system. <br /> BUDGET HIGHLIGHTS <br /> • Additional street maintenance worker added in 2022,not included in 2022 budget-$74,310-2023 exp <br /> • (Coded under departments,260,311,312) <br /> • PW Superintendent position not refilled <br /> • City Engr/PW Direction Salary <br /> • New Snow Pusher Box for Front-end loader-$18,855 <br /> • New 3/4 ton pick-up with plow equipment-$58,542 <br /> • Replace 3/4 pickup with dump&plow-$75,310 <br /> • Replace tandem dump with plow-$270,950 <br /> GOALS OF CURRENT YEAR BUDGET: <br /> Maintain and improve city's rating of 7.0 average of road condition <br /> Increase use of contracted services on pothole repair(velocity patching) <br /> Increase prevenative maintenace to prolong the life of our public streets <br /> Maintain our city vehicles and equipment to the highest level possible <br /> Performance Measurements: <br /> 2018 Actual 2019 Actual 2020 Actual 2021 Actual 2022 Projected 2023 Projected <br /> Crack filling(miles) 7.95 21.5 7 20.88 10.37 15 <br /> Sealcoating(miles) 7.5 0 0 0 0 0 <br /> Asphalt patching(tons) 150 532 500 <br />