Laserfiche WebLink
CC Regular Session 5. 15. <br /> Meeting Date: 07/26/2022 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title <br /> Adopt Resolution#22-171 Approving Proposal for Exploratory Watermain Excavation for Improvement Project <br /> #21-08,Water Treatment Plant Trunk Watermain Improvements. <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-171 approving the proposal from Dave Perkins Contracting, <br /> Inc. to complete exploratory watermain excavation work as needed to finalize plans for rebidding Improvement <br /> Project#21-08, Water Treatment Plant Trunk Watermain Improvements. <br /> Background: <br /> As part of the development of The COR(previously Ramsey Town Center),municipal water supply wells and trunk <br /> Watermain was constructed throughout The COR. Unfortunately,the developer went bankrupt before development <br /> of The COR was complete so the City never received asbuilt record plans for much of the infrastructure that was <br /> constructed, including trunk watermain lines. <br /> Numerous Watermain lines exist In the southeast quadrant of the intersection of Bunker Lake Boulevard and Center <br /> Street. These lines include raw watermain that carries untreated water from the municipal wells to the pumphouses <br /> where chemicals are added to treat the water, and finished watermain that carries the treated water to the trunk water <br /> supply distribution system. These trunk watermain lines cannot be accurately located without uncovering them and <br /> surveying them to determine their exact locations. Asbuilt plans can then be made using this data. While these lines <br /> are uncovered they will also be tapped to verify the lines are in use and were not abandoned in place. <br /> This work will allow the final plans to be updated to minimize chances for change orders during construction of the <br /> trunk watermain improvements, and will allow Staff to prepare asbuilt record plans that can then be provided to <br /> developers seeking to develop this City-owned property in the future, which has presented barriers to development <br /> in the past. <br /> Notification: <br /> Notifications are not required for this case. <br /> Funding Source: <br /> This work is proposed to be funded using water utility funds. <br /> Recommendation: <br /> Staff recommends approving the proposal from Dave Perkins Contracting,LLC in the amount of$13,575 for <br /> exploratory watermain excavation work for Improvement Project#21-08, Water Treatment Plant Trunk Watermain <br /> Improvements. <br /> This work will not only allow the plans for Improvement Project#21-08 to be completed, it will also allow Staff to <br /> prepare asbuilt record plans for the trunk watermain in the southeast quadrant of the intersection of Bunker Lake <br /> Boulevard and Center Street,which Staff will then be able to share with developers as future development <br /> proposals are received for this City-owned property. . <br />