Laserfiche WebLink
From: Bob Vollhaber <br /> To: Aaron Madsen <br /> Cc: Rodney Riemann <br /> Subject: pricing for watermain exploration work <br /> Date: Friday,July 1,2022 2:13:31 PM <br /> Attachments: imaae001 Jga <br /> Aa ro n, <br /> Price to dig 2 exploratory watermain excavations to determine existing pipe layout is $19,500. This <br /> is for the work you and Rodney discussed onsite (I have not received any sketch or plan from you). <br /> Price includes restoring class 5 aggregate base and bit patching with 3" of mix placed with skidsteer <br /> as I understand the patch is temporary in nature. Price does not include special excavation and or <br /> shoring methods if inplace utilities preclude normal excavation and placing of trench box to safetly <br /> excavate to invert of watermain pipes. <br /> Let me know if you have any questions. <br /> Thanks, <br /> Bob vollhaber <br /> President <br /> FOREST LAKE CONTRACTING,INC. <br /> 14777 Lake Drive <br /> Forest Lake, Minnesota 55025 <br /> Phone: 651-464-4500 <br /> Fax: 651-464-4722 <br /> bob&fore stlakec ontractin g.com <br /> FS-1 <br />