My WebLink
|
Help
|
About
|
Sign Out
Home
08/05/22
Ramsey
>
Public
>
City Update
>
2022
>
08/05/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:54:20 AM
Creation date
8/5/2022 1:27:59 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2022
Document Title
08/05/22
Retention Date
12/31/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Why the change? <br />In a word, safety. <br />Because of the unique combination of Anoka's roads, traffic patterns, and the multiple construction <br />sites in the city, crews are building the overpasses while maintaining traffic on Hwy 10. The traffic plan <br />called for tall vehicles to be detoured around the site during the first stages of overpass construction. <br />But when there is low clearance, there is always a risk of bridge strikes; inevitably, some motorists either <br />underestimate their height or miss their detour, and the top of their vehicle strikes the bridge. Under <br />some conditions, a bridge strike to the temporary structures during the early construction stages at <br />Fairoak could have presented a safety risk to motorists or crews. <br />The engineers from MnDOT, the contractor team, and the City of Anoka all agreed that for the safety of <br />motorists and crews, at least during the initial bridge construction, the intersection at Fairoak Ave <br />should be closed to all traffic. <br />The project team will be continuing to evaluate options to safely provide the most access with the least <br />disruption. <br />There will be no changes to the current pedestrian and bicycle access. <br />Thank you for your understanding and patience as crews continue work on Hwy 10 in Anoka. <br />All construction activities and traffic impacts are weather permitting and subject to change. <br />More about this project <br />MnDOT and the City of Anoka are working together to reconstruct and improve roads and bridges on Hwy 10 <br />between Thurston Ave. and 7th Ave. through Anoka. When complete, the two-year Hwy 10 Anoka project <br />will improve traffic flow, decrease traffic delays and increase safety. Construction is anticipated to be <br />completed in spring 2024. <br />Drivers should plan for delays when travelling on Hwy 10. <br />• Allow for plenty of extra time <br />• Travel outside of rush hour times <br />• Follow posted detour routes and avoid cutting through neighborhoods <br />• Consider Metro Transit buses, Northstar commuter rail, carpooling, Park & Ride lots, or <br />telecommuting <br />• Visit 511mn.org or download the Minnesota 511 app on your Apple or Android device for real time <br />traffic information <br />For more information, including upcoming traffic impacts, visit the Hwy 10 Anoka project webpage. If you <br />have any questions about the project, contact the contact the project team. <br />
The URL can be used to link to this page
Your browser does not support the video tag.