Observations: <br />On July 29, 2022, a total of four (4) bids were received, opened, tabulated, and found to comply with the <br />advertisement for bids. <br />,CONTRACTOR <br />Douglas -Kerr Underground, L.L.C. <br />Forest Lake Contracting, Inc. <br />New Look Contracting, Inc. <br />North Valley, Inc. <br />Engineer's Estimate <br />TOTAL BID <br />$2,342,102.66 <br />$2,368,094.65 <br />$2,441,445.45 <br />$2,463,365.28 <br />$2,346,670.50 <br />The bid of Douglas -Kerr Underground, L.L.C. of Mora, Minnesota, in the amount of $2,342,102.66 for the total bid <br />for construction of said improvements in accordance with the approved plans and specifications and advertisement <br />for bids, is the lowest responsible bidder. Adding indirect costs of 23-percent for administrative, engineering, <br />finance, and legal costs brings total project costs based on the low bid to $2,880,786.27. <br />The 4 bids received were very competitive. The low bid is 0.2-percent less than the engineer's estimate. <br />Bid results were sent to the MnDOT State Aid Agreements Engineer for concurrence. Attached is a copy of the bid <br />concurrence letter received from MnDOT, which is one of two requirements of MnDOT before allowing a contract <br />for construction to be executed. The other requirement is for the Cooperative Construction Agreement to be <br />executed by MnDOT. At the time this case was published, Staff had not yet received an executed Cooperative <br />Construction Agreement from MnDOT. An update will be provided while presenting this case to Council. <br />Resolution #22-176 requires Cooperative Construction Agreement #1050030 to be executed by MnDOT before a <br />contract for construction can be executed for Improvement Project #20-05. <br />Alternatives: <br />Alternative #1: <br />Motion to adopt Resolution #22-176 accepting bids and awarding a construction contract for Improvement Project <br />#20-05, Riverdale Drive Extension, Llama Street to Bowers Drive, to Douglas -Kerr Underground, L.L.C. for their <br />bid in the amount of $2,342,102.66. <br />Alternative #2: <br />Motion denying adoption of Resolution #22-176 at this time. <br />Funding Source: <br />Total project costs based on the low bid are estimated at $2,880,786.27. <br />The engineer's estimate from February 2022 was $1,456,310.50. Costs have generally increased since then due to; <br />• Increased material prices for the watermain loop between Riverdale Drive and Bunker Lake Boulevard. <br />• Increased bituminous prices. <br />• Including the reconstruction of Riverdale Drive east of Llama Street. <br />• Including the MnDOT required median cable barrier along Highway 10, though this will be reimbursed by <br />MnDOT. <br />• Including sewer and water services on the west end of the project, though this cost will be reimbursed by the <br />developer through a separate cost -share agreement that will be presented to the City Council for approval <br />before the improvements are constructed. If an agreement is not executed, this work will not be completed. <br />• Inflation across all remaining bid items. <br />Bolton and Menk, Inc. prepared final plans and specifications for Improvement Project #20-05, Riverdale Drive <br />Extension, Llama Street to Bowers Drive, at a not -to -exceed fee of $89,024. This cost is being shared among the <br />project funding partners per the previously approved, executed and recorded assessment agreements. <br />Bolton and Menk, Inc. has submitted the attached proposal for construction related services in the amount of <br />