My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 08/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:35:53 PM
Creation date
8/8/2022 3:56:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/08/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tcEAtt <br />PROJECT AREAS: <br />z <br />0 <br />0 <br />SHEETS No. 29 - 41 <br />SHEETS No. 03 <br />DESCRIPTION <br />Llj <br />(P, <br />2 <br />8 <br />2 <br />2 <br />2 <br />FINALSTABILIZATION <br />EROSION AND SEDIMENT CONTROL DETAILS <br />EROSION AND SEDIMENT CONTROL QUANTITIES: <br />H <br />z <br />0 <br />0 <br />U - <br />c>3 <br />DESCRIPTION <br />STORM DRAIN INLET PROTECTION - CULVERT <br />STABILIZED CONSTRUCTION EXIT <br />RANDOM RIPRAP CLASS III <br />HYDRAULICATR TYPE MULCH <br />IMPLEMENTATION SCHEDULE AND PHASING: <br />STORM WATER POLLUTION <br />PREVENTION PLAN <br />AUTUMN HEIGHTS STREET <br />.82 <br />9 <br />ro, 1;4 <br />.42t ,m <br />-E)4 _11) 1 I 1141-45 <br />_acc2-. 8 1 L' 21 1 <br />ti-.T.TcS Vg3g <br />44” gaci <br />WIP2 <br />' Oil <br />Iil r° <br />8 <br />[11 24-q4 '71(ai' <br />,S2>> <br />(*IV <br />01 gkSE tilP*-11 <br />EW haf." <br />PO '"ti4 <br />141Eli <br />E <br />2 <br />11-E LL-q) hqiNi <br />rg° !IN <br />cuv, 4„ 2 <br />b-2 E.°3 1111-: <br />,4,)22v,;EI5 <br />pi <br />,42g0144-q04114t <br />iiiNgilln <br />ih492-2., <br />4 <br />4,3, H2 <br />_d u 1t1!"! <br />RECONSTRUCTIONS <br />DESCRIPTION OF CONSTRUCTION ACTIVITIES AND STORMWATER MANAGEMENT: <br />truction, Temporary Erosion and Sediment <br />RESPONSIBLE PARTIES: <br />9 <br />29 <br />Does any portion of the site have the potential to affect threatened or endangered species? <br />2 <br />1 <br />E. 7, <br />I <br />12, <br />r <br />9 <br />Have any Karst features been identified in the project vicinity? <br />9 <br />Is compliance with temporary or permanent stormwater management design requirements infeasible for this project? <br />POLLUTION PREVENTION MANAGEMENT MEASURES: <br />CONTACT PERSON <br />5 <br />5 <br />5 <br />2 <br />2 <br />5 <br />25 <br />55 <br />r8.1:.7!.fles <br />.(4' <br />E,, <br />1)-Eltrih 74 <br />Umt+,1 1i <br />° -+swt 4--.1.1, <br />,.s492L-5_4dL7,,, <br />b.q_fi), MI <br />• E i_N§lkqii HI'!" <br />4', 1 5 <br />,A L>, <br />1111111H IN!! <br />-6 <br />1 <br />h`b),) 3,,c <br />z <br />-E--,%:1-,v,,S <br />.414;i02311420.454LEEt'l <br />ilih“;! f)-) ri (; <br />23g-NH?_3-2, <br />991 <br />59 <br />TROTT BROOK <br />DO; FISHESBIO; INVERTBIO <br />HDD <br />6 <br />‘7, <br />
The URL can be used to link to this page
Your browser does not support the video tag.