Laserfiche WebLink
m <br />cc <br />0W <br />W <br />cc <br />OAKRIDGE PARK <br />P-BUR <br />O <br />O <br />M <br />0 <br />0 <br />0 <br />+ <br />0 <br />N z <br />Q 0 <br />c~ ~ <br />Z < <br />w U <br />2x <br />W <br />w <br />Q <br />Cl_ Q <br />W <br />0m <br />N <br />W _ <br />cc N <br />P-BUR <br />0 <br />Z <br />SALVAGE MAILBOX SUPPORT <br />ALL REMOVALS MUST BE <br />1. REMOVALS WILL BE MARKED IN THE FIELD BY CITY STAFF. <br />FULL DEPTH RECLAMATION <br />F <br />0 <br />U <br />2. CULVERT REMOVAL LENGTH INCLUDES END SECTIONS. <br />REMOVE PAVEMENT- BITUMINOUS <br />3. PROTECT LANDSCAPING AND IRRIGATION. PROPERTY OWNERS ARE TO LOCATE AND <br />MOVE IRRIGATION BEFORE CONSTRUCTION. <br />4. EROSION CONTROL MUST BE IN -PLACE PRIOR TO REMOVALS. SEE SHEET 13. <br />MILL BITUMINOUS PAVEMENT - STREET TIE-IN <br />z <br />0 <br />11 <br />