My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 08/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:35:53 PM
Creation date
8/8/2022 3:56:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/08/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I �� Hakanson <br />Anderson <br />July 26, 2022 <br />Joe Feriancek <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Main Office: <br />3 601 Thurston Avenue, Anoka, MN 55303 <br />Phone: 763/427-5860 <br />www.haa-inc.com <br />SENT VIA EMAIL: jferiancek@ci.ramsey.mn.us <br />RE: Construction Staking Services — City of Ramsey Projects 22-02 Autumn Heights <br />Dear Mr. Feriancek: <br />Thank you for the opportunity to submit a proposal for our services on the above projects. I <br />understand that the scope of our services is to provide construction staking services as needed and <br />directed. <br />Hakanson Anderson proposes to conduct this work on an hourly basis based upon the attached hourly <br />rate schedule. <br />SCOPE OF WORK <br />Project 22-02 <br />• Office setup and coordination <br />• Stake the silt fence <br />• Stake 6 culverts <br />• Stake drain tile <br />• Grade stakes for 600 feet of subgrade excavation <br />• Blue top centerline <br />• Stake edge of pavement for 169th cul-de-sac <br />• Stake curb and gutter <br />Hourly not to Exceed $10,840.00 <br />➢ As -built Surveys are not included in this estimate <br />The above stated hourly amount is based on survey control points being found in place, electronic <br />files of necessary construction documents being available for our use and a one-time staking per item. <br />Significant re -staking and services provided in addition to those proposed will be billed hourly per <br />our standard fee schedule. <br />To better serve you, we request that final plans and specifications for new projects arrive in our office <br />a minimum of five working days before staking is needed on site. After staking has started on site, a <br />two to three-day notice for return visits is requested. It is the contractor's responsibility to provide <br />shop drawings or updated plans when applicable. <br />If this proposal meets with your approval, please sign the acceptance below and return a copy to our <br />office. If you have any questions or need any further information, feel free to call at your <br />convenience. 763-852-0486 <br />
The URL can be used to link to this page
Your browser does not support the video tag.