Laserfiche WebLink
•Bolton&Menk preparing plans and specifications <br /> •60-percent plans under review by Staff <br /> •Construction anticipated Fall 2023 through early 2026 (2024/25 majority) <br /> •Riverdale Drive Extension—Llama Street to Bowers Drive(IP#20-05) <br /> •Preconstruction meeting held August 17th <br /> • Substantial completion proposed September 30th <br /> •Final completion proposed October 31st <br /> •Wetland 114P Outlet Control Improvements (#19-07) <br /> o Requested by Minnesota DNR <br /> o Staff is preparing plans, including boardwalk reconstruction <br /> o Construction proposed for winter 2022/2023 <br /> City of Anoka Improvement Projects <br /> •Highway 47 Corridor Improvements <br /> •Construction proposed for 2025 <br /> • Anoka webpage https://clients.bolton-menk.com/anokahwy47/ <br /> Anoka County Improvement Projects <br /> •Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP#23-03) <br /> o Anoka County received $1.35M in HSIP funds (est. project cost$1.5M) <br /> o Council approved JPA May 24th with City cost share= $28,667.64 <br /> o Construction proposed for 2023,pending final City&County approvals <br /> MnDOT Improvement Projects <br /> •Anoka Solution Highway 10 Improvements <br /> o Construction in progress <br /> o Final completion proposed for Spring 2024 <br /> o Anoka webpage https://clients.bolton-menk.com/hwy10/ <br /> o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br /> •US 10/169 &Ferry Street/TH 47 Interchange <br /> o Construction in progress with completion proposed in Spring 2024 <br /> o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br /> •Ferry Street/Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br /> o Preliminary design suspended to explore s-curve realignment <br /> o$45M in bonds authorized October 2020 <br /> o Construction proposed for 2024 or later <br /> o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy47rr-anoka/ <br /> •Rum River Bridge Replacement <br /> •Construction in progress with completion proposed in Spring 2024 <br /> •Proposing three lanes each direction between Highway 47 and 7th Street <br /> •MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br /> Studies &Items of Interest <br /> •5805 148th Lane NW <br /> •No updates. Property owners are content as is. <br /> • CSAH 5/Nowthen Boulevard Corridor Study <br /> •Final report will be reviewed with PWC in Fall 2022 <br /> •Elk River Highway 10 Corridor Study <br /> • Study website https://www.highwaylOcorridorstudy.com/ <br /> •Final report will be reviewed with PWC in Fall 2022 <br /> Timeframe: <br />