My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 07/19/2022
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2022
>
Minutes - Public Works Committee - 07/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:50:44 PM
Creation date
8/24/2022 2:36:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
07/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer Westby replied that the culverts are needed to direct stormwater runoff under streets <br /> and driveways to the proper areas for drainage and storage, and to prevent flooding of properties. <br /> Mr. Ridgeway commented that the culvert needs to be replaced. He stated that the water on his <br /> property needs to be channeled away from his home. <br /> Councilmember Woestehoff asked if the Ridgeways replaced the septic system. <br /> Mr. Ridgeway replied that the septic system was replaced prior to their purchase of the home. <br /> Councilmember Woestehoff commented that typically a drain field cannot be in the same location <br /> as the last and therefore that would lead him to believe the septic was previously located in a <br /> different location. <br /> Mr. Ridgeway noted that the previous owners apparently experienced flooding, but they had not <br /> been told that or they would not have purchased the home. <br /> Chairperson Riley noted that would be a separate real estate issue. He commented that he can see <br /> that the property as a whole is at a lower elevation. He noted that staff will provide an update on <br /> this item later on the agenda. <br /> City Engineer Westby stated that although staff often reviews the conditions of culverts under <br /> driveways, it would be the responsibility of the property owner to replace the culvert under a <br /> driveway if needed. He confirmed that he did speak with Mr. Ridgeway to provide an update on <br /> the discussion that occurred from the previous meeting. <br /> Chairperson Riley asked what the Ridgeways would want. <br /> Mr. Ridgeway stated that he would like fencing installed at the end of the culvert to ensure a child <br /> could not get sucked into that. <br /> Councilmember Woestehoff stated that the harder question would be what else Mr. Ridgeway <br /> would want. He asked how that would be most effectively done. <br /> Mr. Ridgeway stated that the idea of an easement was previously discussed, and they would agree <br /> with that option. He stated that they just do not want to be flooded again and would like something <br /> to happen before winter. <br /> Councilmember Woestehoff stated that other than calling the police, he would wonder if there was <br /> a reason the residents reached out to the City. <br /> Mrs. Ridgeway replied that they called 911 because they had been bailing water for more than an <br /> hour. She noted that they were unsure of what to do. <br /> Public Works Committee/July 19, 2022 <br /> Page 3 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.