Laserfiche WebLink
f <br />PSD - PARKVIEW EAST APARTMENTS - INFRASTRUCTURE ESTIMATE - PUBLIC <br />CITY OF RAMSEY, MN <br />BMI #R16.109475 <br />DATE: 9122/2015 • <br />ITEM <br />NO. <br />REM DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />QUANTITY <br />TOTAL <br />COST <br />PUBUC IMPROVEMENTS • ROADWAY 8 SIDEWALK <br />- <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$25,000.00 <br />1 <br />$25,000.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />• <br />SO YD <br />$2.00 <br />780 <br />$1,560.00 <br />3 <br />REMOVE CONCRETE WALK <br />UN FT <br />$1.00 <br />430 <br />$430.00 <br />4 <br />REMOVE CONCRETE CURB AND GUTTER <br />UN FT <br />$10.00 <br />55 <br />$550.00 <br />5 <br />SAWING BITUMINOUS PAVEMENT <br />UN FT <br />$3.50 <br />66 <br />$231.00 <br />8 <br />TOPSOIL BORROW <br />CU YD <br />$25.00 <br />500 <br />$12,500.00 <br />7 <br />COMMON EXCAVATION <br />CU YO <br />$12.00 <br />1100 <br />513,200.00 <br />8 <br />AGGREGATE BASE CLASS 5 (CV( <br />CU YD <br />$25.00 <br />600 <br />$15,000.00 <br />9 <br />TYPE SP 9.5 WEARING COURSE (2,13) (SPW EA2405) (2360) <br />TON <br />$75.00 <br />235 <br />$17,625.00 <br />10 <br />TYPE SP 12.5 NON•W EARNG COURSE (2,B) (SPNW B2306) (2360) <br />TON <br />$70.00 <br />235 <br />$16,450.00 <br />11 <br />ADJUST VALVE BOX <br />EACH <br />$500.00 <br />1 <br />5500.00 <br />12 <br />PEDESTRIAN CURB RAMPS <br />EACH <br />52,000.00 <br />7 <br />$14,000.00 <br />13 <br />5' CONCRETE WALK <br />SO YD <br />$49.00 <br />750 <br />$36,750.00 <br />14 <br />CONCRETE CURB d GUTTER <br />I.IN FT <br />$14.00 <br />1200 <br />$16,800.00 <br />15 <br />TRAFFIC CONTROL . <br />LUMP SUM <br />$1,000.00 <br />1 <br />51,000.00 <br />16 <br />SGNAGE <br />LUMP SUM <br />$2,500.00 <br />1 <br />$2,500.00 <br />17 <br />LANDSCAPE TREES <br />EACH <br />$600.00 <br />27 <br />$16,200.00 <br />$10,000.00 <br />18 <br />IRRIGATION SYSTEM <br />LUMP SUM <br />$10,000.00 <br />1 <br />19 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$150.00 <br />25 <br />$3,750.00 <br />20 <br />SILT FENCE <br />LIN FT <br />$4.00 <br />500 <br />$2,000.00 <br />21 <br />OITCH CHECK TYPE BIOLOG <br />LIN FT <br />54.00 <br />500 <br />$2,000.00 <br />22 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />$1,500.00 <br />2 <br />$3,000.00 <br />23 <br />SOD <br />SO YD <br />$5.00 <br />2500 <br />512,500.00 <br />TOTAL PUBLIC ROADWAY & SIDEWALK COST: <br />$223,546.00 <br />STORM SEWER <br />1 <br />24- RC PIPE SEWER DES 3006 CL 91 <br />LIN FT <br />$41.00 <br />56 <br />52,296.00 <br />2 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />1 <br />51,000.00 <br />3 <br />CONSTRUCT DRAINAGE STRUCTURE 96' DESIGN 4022 <br />LIN FT <br />$850.00 <br />6.74 <br />55,729.00 <br />4 <br />CASTING ASSEMBLY <br />EACH <br />$550.00 <br />1 <br />$550.00 <br />TOTAL STORM SEWER COST: <br />$9,575.00 <br />WATERMAN E SANITARY SEWER - PUBUC <br />1 <br />PIPE FtTTNGS <br />POUND <br />$8.00 <br />350 <br />- $2,800.00 <br />2 <br />6- GATE VALVE ABOX <br />EACH <br />$1,500.00 <br />1 <br />$1,500,00 <br />3 <br />r GATE VALVE & BOX <br />EACH <br />52,000.00 <br />4 <br />5E4000.00 <br />$2,400.00 <br />4 <br />CONNECT TO EXISTING WATER MAW <br />EACH <br />$1,200.00 <br />2 <br />5 <br />HYDRANT <br />EACH <br />$4,000.00 <br />1 <br />$4,000.00 <br />$492.00 <br />6 <br />6- DIP CI. 52 WATERMAIN <br />UN FT <br />$41.00 <br />12 <br />7 <br />e- DIP CL 52 WATERMAIN <br />LIN FT <br />$45.00 <br />405 <br />$18,225.00 <br />8 <br />4- WATERMAIN INSULATION <br />SO YD <br />$50.00 <br />10 <br />$500.00 <br />8 <br />CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />$1,700.00 <br />1 <br />$1,700.00 <br />$2,560.00 <br />t0 <br />W PVC SANITARY SEWER SDR 26 <br />LIN FT <br />$40.00 <br />64 <br />1 t <br />4r SANITARY MANHOLE <br />LIN FT <br />$350,00 <br />9.63 <br />$3,370.50 <br />12 <br />CASTING ASSEMBLY <br />EACH <br />$550.00 <br />1 <br />$550.00 <br />TOTAL WATERMAIN & SANITARY SEWER - PUBLIC COST: <br />546,097.50 <br />TOTAL ESTIMATED CONSTRUCTION COST: <br />$279,21850 <br />