Laserfiche WebLink
identified in this section for payment, but required to complete the project as per the plans and <br />specifications shall be considered incidental to the project. <br />Mobilization — Payment shall be made on a lump sum basis for the mobilization of equipment. <br />Geotechnical Report — Payment shall be made on a lump sum basis as compensation for all <br />development of the geotechnical report meeting the requirements outlined in this RFP. <br />Soil Boring — Payment shall be made on a per each basis as compensation for all equipment, <br />material and labor costs required for the soil boring and all required documentation of soil borings <br />as outlined in this RFP. <br />Soil Boring Additional Depth — Payment shall be made on a per lineal foot basis as compensation <br />for all equipment, material and labor costs required for soil boring at depth beyond depth as stated <br />in the introduction. The cost of meeting any Minnesota Department of Health requirement for <br />abandonment of geotechnical soil bore holes, including holes deeper than 15-feet are incidental to <br />this pay item. <br />Traffic Control — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation and maintenance of traffic control measures <br />(signage, barricades, flashers, flaggers, etc.), as directed by the Engineer, for any local traffic <br />disruptions or temporary closures. <br />6 <br />