My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 08/23/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:37:12 PM
Creation date
8/25/2022 8:58:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKING HOURS: The work shall be carried out during normal working hours so as not to <br />cause any unreasonable nuisance to affected residents and businesses. Under emergency <br />conditions, this limitation may be waived in writing by the Engineer in conjunction with qualified <br />local authority. Normal working hours for this work are considered to be from 7:00 a.m. to 7:00 <br />p.m., Monday through Friday. <br />WORK AND STAGING AREAS: Contractor shall confine their work activities within the right <br />of way at all times. No equipment shall be left on city streets outside normal working hours. <br />TRAFFIC CONTROL: Contractor will be required to follow the most current edition of the <br />Temporary Traffic Control Zone Layout Manual. <br />SPECIFICATION REFERENCES: Contractor shall conduct all work in conformance with the <br />specifications set forth herein and in accordance with the most current edition of the Minnesota <br />Department of Transportation Standard Specifications for Construction, which is incorporated by <br />reference to these specifications. <br />PAYMENT: Partial and final payments will be made upon submittal of each pay request to the <br />City on a net 30-day basis following City acceptance of all work items included on the pay request. <br />An IC 134 form will be required prior to final payment. <br />BASIS OF PAYMENT: Payment shall be made for all components of the work as specified in <br />this RFQ. The cost of any additional equipment, labor, materials, permits, tools, and supplies <br />which have not been specifically identified in this RFQ for payment, but are required to complete <br />the work, shall be considered incidental to the project. <br />3 <br />RFQ — 2022 MSA PAVEMENT MARKING IMPROVEMENTS <br />CITY IMPROVEMENT PROJECT #22-13 <br />Revised 8/15/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.