Laserfiche WebLink
22-13 2022 MSA Pavement Marking Improvements <br />Quote Form <br />Item MnDOT Estimated <br />No. No. Item Unit Quantity Unit Cost Cost Extension <br />1 2021.501 Mobilization LS 1 <br />2 2102.503 Pavement Marking Removal LF 208 <br />3 2102.518 Pavement Marking Removal SF 92 <br />4 2563.601 Traffic Control LS 1 <br />5 2582.501 Pavt Mssg (LT Arrow) — Epoxy EA 2 <br />6 2582.501 Pavt Mssg (Rt Arrow) — Epoxy EA 3 <br />4" Double Solid Line Yellow — <br />7 2582.502 Epoxy LF 17396 <br />8 2582.502 4" Solid Line Yellow — Epoxy LF 7842 <br />9 2582.502 4" Solid Line White — Epoxy LF 57781 <br />10 2582.502 24" Solid Line Yellow — Epoxy LF 44 <br />11 2582.502 24" Solid Line White — Epoxy LF 117 <br />12 2582.518 Crosswalk Markings - Epoxy SF 576 <br />Rail Road Crossing Markings - <br />13 2582.518 Epoxy SF 96 <br />Total Quote (Items 1 — 13) <br />Revised 8/16/2022 <br />