My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 08/23/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:37:12 PM
Creation date
8/25/2022 8:58:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preliminary estimate with these additional items included and estimates project costs to be $1,026,000. Portions of <br />these costs will be reimbursed as part of the PACT Charter development. <br />Staff proposes to create the plans and specifications in-house as part of their normal duties. <br />The street improvements proposed with this project are identified in the City's current 10-year CIP, and can be <br />funded using a combination of MSA Funds and Storm Water Utility Funds. Water and sanitary sewer <br />improvements are necessary for the PACT Charter School development, as well as the future Saint Katherine <br />Drexel development, and can be funded using a combination of Water Utility Funds and Sanitary Sewer Utility <br />Funds. This project would best be constructed as a stand-alone project and is necessary, feasible, and cost-effective <br />from an engineering standpoint, and can be constructed as proposed herein. <br />The proposed improvements are designated as City Improvement Project #23-01, 161st Avenue Reconstruction. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Motion to adopt Resolution #22-200 Ordering Plans and Specifications for Improvement Project #23-01, 161st <br />Avenue Reconstruction. <br />Funding Source: <br />Funding for this improvement is proposed to come from the MSA Fund, Stormwater Utility Fund, Water Utility <br />Fund, and Sanitary Sewer Utility Fund <br />• (MSA) Street Project Cost $ 566,000 <br />• (MSA) Trail Project Cost $ 71,000 <br />• Storm Sewer Project Cost $ 220,000 <br />• Water Project Cost $ 94,000 <br />• Sanitary Sewer Project Cost $ 75,000 <br />• Total Estimated Project Cost $1,026,000 <br />Recommendation: <br />Staff recommends adopting Resolution #22-200 ordering plans and specifications for improvement project #23-01, <br />161 st Avenue Reconstruction. <br />Action: <br />Adopt Resolution #22-200 ordering plans and specifications for improvement project #23-01, 161st Avenue <br />Reconstruction. <br />Attachments <br />Res 22-200 <br />23-01 Project Scope <br />23-01 22-31 CIP Sheet <br />23-01 Street Summary <br />Form Review <br />Inbox Reviewed By Date <br />Bruce Westby Bruce Westby 08/18/2022 10:49 AM <br />Brian Hagen Brian Hagen 08/18/2022 02:30 PM <br />Form Started By: Joe Feriancek Started On: 08/17/2022 11:13 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.