Laserfiche WebLink
2022 thru 2031 <br />Street Improve <br />U <br />U <br />1 <br />1) <br />Street Improvement <br />[ v w > <br />d �?10. <br />o <br />E • a E. ▪ e) <br />• o <br />CI 4.. <br />Ct <br />o. C.)y U <br />A <br />21-STR-010 <br />Project Name MSA 167th Avenue Street Reconstruction <br />1-Existing Obligation (H <br />Q <br />P. <br />Total Cost $1,492,260 <br />een CSAH 5 and TH 47. <br />0 <br />• <br />ti <br />U <br />0 <br />O <br />U <br />O <br />0 <br />0 <br />0 <br />O. <br />0 <br />0 <br />0 <br />bA <br />• 0 <br />O <br />• "O <br />o 4D <br />• 0 <br />U O <br />U � <br />O v <br />y 0 <br />• <br />0 O <br />0ct <br />c <br />0.ct <br />cC <br />O 0 <br />CA <br />• ' 1 <br />Q+ U <br />0 <br />0 <br />C -c <br />0 0 <br />� 3 <br />w <br />c <br />0 0 <br />0 <br />y <br />3 ,y <br />0 <br />-a <br />O <br />0 <br />O <br />reconstruction at <br />CC <br />0 <br />01 <br />N <br />N <br />N <br />Expenditures <br />O <br />CO <br />CN <br />CO <br />rn <br />c <br />as <br />0 <br />00 <br />0 0) <br />fs <br />= <br />_Em <br />0 <br />0 <br />r�0 <br />N <br />N <br />O <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />Funding Sources <br />O O <br />O to <br />co co <br />O lfi <br />M <br />o o <br />co co <br />V) CO <br />CO <br />Storm Water Utility Fund <br />0 <br />0 <br />