My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 08/23/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:37:12 PM
Creation date
8/25/2022 8:58:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the form of a Letter of Credit in a form acceptable to the CITY'S Finance Director <br />or cash escrow. <br />15. Stage I and Stage 11 Improvements to Outlots. The PERMITTEE acknowledges <br />that Stage I and Stage 11 Improvements are not being required for proposed Outlots, <br />but will be required upon development of said Outlots. <br />16. Street Cleaning and Clean Up. After the street surfacing that is a part of the Stage <br />I and Stage'll Improvements is installed, the PERMITTEE shall clear any soil, <br />earth, or debris from the streets. From time to time, the CITY may remove <br />accumulations of soil, earth, and debris from the streets resulting from the <br />construction of the improvements. It shall be the PERMITTEE'S responsibility <br />to pay the reasonable costs associated with this necessary street cleaning. Invoices <br />from the CITY to the PERMITTEE for such costs shall be paid within fifteen (15) <br />days of the date of the invoice. <br />17. Payment of Development Fees. The PERMITTEE must pay to the CITY the fees <br />described on Exhibit B which may include, but are not limited to, Park Land <br />Dedication Fees, Trail Development Fees, Sanitary Sewer Connection (Trunk) <br />Fees, Water Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, Water Lateral <br />Fees, Storm Management Fees, Street Light as well as Street Light Operation and <br />Maintenance Fees. <br />18. Requirements for Building and Occupancy Permits. <br />a. No building permit for any lot in the Plat shall be issued until the <br />PERMITTEE has: (a) installed a Class 5 driving surface to within 300 feet <br />of the structure; (b) provided the CITY Building Official with a Certificate <br />of Survey; c.) the financial guaranty described in Section 6 to the CITY; d.) <br />obtained all necessary permits from the Lower Rum River Watershed <br />Management Organization and the Anoka County Soil Conservation <br />District and has provided a copy of each such permit to the CITY; and <br />b. No occupancy permit for any lot in the Plat shall be issued until the <br />PERMITTEE has: (a) constructed vehicular access to the lot, including the <br />installation of at least one layer of bituminous surfacing; (b) constructed all <br />utilities and storm water facilities this Contract requires to serve the lot and <br />such utilities and storm water facilities are in place, and operational and the <br />CITY has accepted those utilities and storm water facilities; (c) for lots that <br />have a slope of less than 2%, provided the CITY with a certificate of <br />grading, prepared by a licensed (State of Minnesota) professional land <br />surveyor, certifying that the flattest grade on the lot is 1 % or greater; and <br />(d) installed and planted the sod and landscaping that are required as a part <br />of the Stage I Improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.