Laserfiche WebLink
TABLE 5 <br />148TH LANE <br />ALTERNATIVE 2B - 18" OUTLET <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$500.00 <br />1 <br />$500 <br />2 <br />CLEARING <br />TREE <br />$100.00 <br />2 <br />$200 <br />3 <br />GRUBBING <br />TREE <br />$100.00 <br />2 <br />$200 <br />4 <br />REMOVE STORM SEWER <br />LIN FT <br />$5.00 <br />153 <br />$765 <br />5 <br />REMOVE CONCRETE CURB <br />LIN FT <br />$10.00 <br />55 <br />$550 <br />6 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$5.00 <br />61 <br />$305 <br />7 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$3.00 <br />75 <br />$225 <br />8 <br />COMMON EXCAVATION <br />CU YD <br />$5.00 Y <br />100 <br />$500 <br />9 <br />4" AGGREGATE BASE CLASS 5 <br />SQ YD <br />$7.50 <br />61 <br />$458 <br />10 <br />4" BITUMINOUS PATCH <br />SQ YD <br />$28.00 <br />61 <br />$1,708 <br />11 <br />BULKHEAD MANHOLE <br />EACH <br />$500.00 <br />1 <br />$500 <br />12 <br />18" RC PIPE APRON <br />EACH <br />$350.00 <br />1 <br />$350 <br />13 <br />TRASH GUARD FOR 18" PIPE APRON <br />EACH <br />$200.00 <br />1 <br />$200 <br />14 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />2 <br />$2,000 <br />15 <br />18" RC PIPE SEWER DESIGN 3006, CL III <br />LIN FT <br />$23.00 <br />187 <br />$4,301 <br />16 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />EACH <br />$1,500.00 <br />1 <br />$1,500 <br />17 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />$20.00 <br />55 <br />$1,100 <br />18 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$500.00 <br />1 <br />$500 <br />19 <br />CONIFEROUS TREE 4' HT B&B <br />TREE <br />$200.00 <br />2 <br />$400 <br />20 <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />0.1 <br />$150 <br />Estimated Construction Cost <br />Contingency (10%) <br />Permanent Easement ($1.15/ sq ft) <br />Total Estimated Construction Cost <br />$16,412 <br />$1,641 <br />$794 <br />$18, 846 <br />