Laserfiche WebLink
However, Anoka County is planning "interim" improvements to Bunker Lake Boulevard between <br />Armstrong Boulevard and Sunfish Lake Boulevard in 2021 to improve operations and safety in <br />anticipation of traffic volumes doubling while planned improvements to Highway 10 are <br />constructed between 2022 and 2025. Therefore, to construct the raw and finished watermain <br />associated with the water treatment plant project as cost-effectively as possible, plans and <br />specifications for the raw and finished watermain improvements are recommended to be <br />prepared and bid in conjunction with Anoka County's proposed improvements to Bunker Lake <br />Boulevard. <br />FEASIBILITY STUDY RAMSY 154354 <br />Page 44 <br />