Laserfiche WebLink
SODIUM PERMANGANATE FEED EQUIPMENT <br />LUMP SUM <br />1 <br />$ 40,000.00 <br />$ 40,000.00 <br />CHEMICAL FEED PIPING <br />LUMP SUM <br />1 <br />$ 50,000.00 <br />$ 50,000.00 <br />$ 1, 806, 000.00 <br />SUBTOTAL CONSTRUCTION <br />$ 26,060,000.00 <br />CONTINGENCY <br />10% <br />$ 2,606,000.00 <br />TOTAL CONSTRUCTION <br />$ 28,670,000.00 <br />