Laserfiche WebLink
PERSONNEL COMPLEMENT <br />i <br />Public Works Superintendent 1.00 1.00 <br />Secretary (Formerly under Engineering) 1.00 1.00 <br />Mechanic 2.00 2.00 <br />Street Supervisor - - ' <br />Streets Lead Worker 1.00 1.00 <br />PW Maintenance Worker 4.00 5.00 <br />Temporary - Streets 0.50 0.50 <br />Street Maintenance Total 9.50 10.50 <br />' 1.00 <br />1.00 <br />2.00 <br />1.0- 0 <br />5.00 <br />0.50 <br />10.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />5.00 <br />0.50 <br />10.50 <br />6488/6489 Other Contracted Services <br />Pavement Management Program Funding (Transfer to Pavement Management Fund) , . 260,742 300,000 <br />Cracksealing/Rejuvenation/Spray Patching 237,483 237,483 239,258 162,784 200,000 200,000 <br />Spray Patching . - - 375,000 <br />Curb Repair/Tree Removal - 15,000 15,000 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />5.00 <br />0.50 <br />11.50 <br />1.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />5.00 <br />0.50 <br />11.50 <br />237,483 237,483 500,000 . 462,784 215,000 590,000 <br />6540 - Heavy Machinery <br />F350 truck with plow 197,061 - 116,891 <br />1-Ton Truck 37,577 <br />Sidewalk Machine 148,292 <br />Tractor Backhoe ($84,000 total remainder utility funded) 37,688 <br />Tandem Axle Truck with Plow ,,,,_ _. - - 265,800 270,950 <br />234,638 185,980 116,891 265,800 270,950 <br />6550-Motor Vehicle <br />1-ton truck <br />2-3/4 ton trucks with plows (1 new & l'replpcement) <br />6580 - Other Equipment <br />Sidewalk Machine <br />Snow Pusher Box for Front End Loader <br />Trailer for skidsteer <br />Toolcat • <br />Skidsteer <br />ATV Athletic Field•Maintenance Machine 14,032 14,032 <br />14,032 14,032 <br />62,772 <br />62,772 <br />162,723 <br />15,102 <br />36,105 <br />- 57,372 <br />133,852 <br />133,852 <br />18,855 <br />, 271,302 18,855 <br />DESCRIPTION OF SERVICES: <br />The Street Maintenance Department is responsible for maintaining city streets, sidewalks, trafficsigns, boulevards, ROW <br />mowing and the storm water collection system. <br />BUDGET HIGHLIGHTS <br />• Additional street maintenance worker added in 2022, not included in 2022 budget - $74,310 2023 exp <br />• (Coded under departments, 260, 311, 312) <br />• PW Superintendent position not refilled <br />• City Engr/PW Direction Salary % <br />• Additional Spray Patching - 2 Year Funding from ARPA Funds $375,000 Each Year <br />• New Snow Pusher Box for Front-end loader- $18,855 <br />• New 3/4 ton pick-up with plow equipment -$58,542 <br />• Replace 3/4 pickup with dump & plow - $75,310 - <br />• Replace tandem dump with plow $270,950 <br />GOALS OF CURRENT YEARBUDeET4 <br />Maintain and improve city's rating of 7.0 average of road condition <br />Increase use of contracted services on pothole repair (velocity patching) <br />increase prevenative maintenace to prolong the life of our public streets <br />Maintain our city vehicles and equipment to the highest level possible <br />Performance Measurements: <br />Crack filling miles) <br />Sealcoating (miles) <br />Asphalt patching (tons) <br />2018 Actual <br />2019 Actual <br />2020 Actual <br />2021 Actual <br />2022 Projected <br />• 7.95 <br />7.5 <br />150 <br />21.5 <br />0 <br />532 <br />7 <br />0 <br />500 <br />20.88 <br />0 <br />10.37 <br />0 <br />2023 Projected <br />15 <br />0 <br />-51- <br />