Laserfiche WebLink
1459B(b)(1), 1464(d)(2), and 1465 of the Safe Drinking Water Act (42 U.S.C. 300j-19a(b)(2), <br />300j-19b(b)(1), 300j-24(d)(2), and 300j-25), provided that: <br />(A) In the case of lead service line replacement projects, the recipient must replace the <br />full length of the service line and may not replace only a partial portion of the service line; and <br />(B) In the case of projects within the scope of the program the EPA is authorized to <br />establish under section 1459B(b)(1) of the Safe Drinking Water Act, the recipient may determine <br />the income eligibility of homeowners served by lead service line replacement projects in its <br />discretion. <br />(v) Drinking water projects to support increased population. Projects of the type that <br />meet the eligibility requirements of 40 CFR § 35.3520 other than the requirement of <br />subparagraph (b)(1) of such regulation to address present or prevent future violations of health- <br />based drinking water standards, if the following conditions are met: <br />(A) The project is needed to support increased population, with need assessed as of the <br />time the project is undertaken; <br />(B) The project is designed to support no more than a reasonable level of projected <br />increased need, whether due to population growth or otherwise; <br />(C) The project is a cost-effective means for achieving the desired level of service; and <br />(D) The project is projected to continue to provide an adequate level of drinking water <br />over its estimated useful life. <br />(vi) Dams and reservoirs. Rehabilitation of dams and reservoirs if the following <br />conditions are met: <br />(A) The project meets the requirements of 40 CFR § 35.3520 other than the following <br />requirements: <br />428 <br />