My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 10/17/2022
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2022
>
Agenda - Environmental Policy Board - 10/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:09:33 AM
Creation date
10/13/2022 10:40:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Use <br />2. Proposed urban development adjacent to existing single-family rural neighborhoods. This <br />section applies to proposed residential developments that are adjacent to existing rural <br />residential neighborhoods. Matching the proposed use to the adjacent use in the following <br />chart determines the level of buffering or "attainment" required. The numeric attainment <br />level is matched to the level found in the chart in subsection (c)(2)b of this section. <br />Transition Attainment Level <br />Impacted Rural Use <br />R-1 Zone and Central Rural R-1 Zone and Rural <br />Preserve Area, and Rural Preserve Developing <br />R-1 Zone Level 4 Level 3 <br />R-2 Zone Level 4 Level 4 <br />R-3 Zone Level 4 Level 4 <br />PUD Zone - Transition attainment level shall be determined by correlating the overall density to the R-1, 2, <br />or 3 Districts and then applying the corresponding attainment level. The city shall have the authority to <br />make a determination on the proper attainment level if determined necessary. <br />Level 1 <br />Level 2 <br />Level 3 <br />Level 4 <br />b. Methods to achieve buffering attainment level. The following chart is used to determine <br />appropriate landscape buffers when the level of attainment is determined from the charts in <br />subsection (c)(2)a.1 and 2 of this section. <br />Options to achieve attainment <br />Vegetative Buffer "A" <br />Vegetative Buffer "B" <br />Vegetative Buffer "C" <br />Vegetative Buffer "D" <br />1. Vegetative buffer yard definitions: <br />(Supp. No. 11, Update 2) <br />(i) <br />Vegetative Buffer "A" with Berm <br />Vegetative Buffer "B" with Berm <br />Vegetative Buffer "C" with Berm <br />Vegetative Buffer "A" - A minimum 25 feet width in common ownership with <br />the following planting schedule per 100 feet of property boundary adjacent to <br />an impacted use: <br />A. 2 overstory trees. <br />B. 2 evergreen trees. <br />C. 2 understory trees. <br />(ii) Vegetative Buffer "B" - A minimum 35 feet width in common ownership with <br />the following planting schedule per 100 feet of property boundary adjacent to <br />an impacted use: <br />A. 4 overstory trees. <br />B. 4 evergreen trees. <br />C. 4 understory trees. <br />(iii) Vegetative Buffer "C" - A minimum 45 feet width in common ownership with <br />the following planting schedule per 100 feet of property boundary adjacent to <br />an impacted use: <br />A. 8 overstory trees. <br />Created: 2022-10-04 16:03:40 [EST] <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.