Laserfiche WebLink
CITY OF RAMSEY <br /> DEVELOPMENT PERMIT <br />DAVE PERKINS CONTRACTING <br /> <br /> October 25, 2005, Site Plan approval was granted by the City of Ramsey ("City") to Dave Perkins <br />("l'ermittce"), whose address is 14230 Basalt Street NW, Ramsey, MN 553:03, to construct a 20,000 <br /> foot omce and manufacturing facility ("Structure") on the pro~i~:'~ifiTch is legally described <br /> <br />1,13lock 2, GATEWAY NORTH INDUSTRIAL PARK, ,.An~ <br /> Coun~;:i:,~esota <br /> <br /> thc ("S itc"). :::i~:~'!!*.,. <br /> . ' <br /> ',-t. i Q~" , <br />approval is issued pursuant to {}9.03.06 of the City C~ade. The ~bnditions of this <br /> <br />are as <br /> <br />ST R UCTURE. All building plans must be prepared and~'~t'tified by a registered engineer or <br />arch itcct. - <br /> <br />STATE BUILDING CODE COMPLIANCE; :~ The structure shall be constructed in <br />accordance with the requirements of the State BUiiiti.fi'~ilGpde.: <br /> -: .... -- . · <br />SITE PLAN COMPLIANCE. The structures shall be cShstructed on the Site as shown on the <br />Site Plan submittal prepared by Lampert Ardhjtects dated September 6, 2005, revised October <br />7, ?005, and '.:,: 2005. <br /> <br /> IMPROVEMENTS.'.-T. he. pe.,rmi~tee shall construct and install the following site <br />REQUIREI) <br />improvements on the Site in accordance with the specifications and location as shown on the <br />Site Plan. The Required.., Improvements are as follows: <br /> <br />a. Site grading in accordance .with the Grading and Utility Plan prepared by Hakanson <br /> Anderson dated September 61 2005 and revised October 7, 2005. <br />b. Installation of concrete and bituminous driveways, parking lot, and Limonite Street for 300 <br /> [bet south of 143rd Avenue. <br /> Installation 6f storm sewer, sanitary sewer, watermain, and appurtenances. <br /> Installation of B~6/12 continuous concrete curbing around the perimeter of all concrete <br /> and/or bituminous surfaces. <br /> L:stablishment of turf in areas disturbed during construction in accordance with the Site <br /> I) lan. <br /> Installation and removal of temporary erosion control measures. <br /> Installation of landscaping materials in accordance with the Landscape Plan prepared by <br /> I,ampert Architects dated September 6, 2005. <br /> hTigation metering and backfiow devices shall be approved as part of the Utility Plan, and <br /> installed accordingly. <br /> <br /> <br />