My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/07/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 11/07/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:58:21 PM
Creation date
11/4/2005 12:59:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/07/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL PAy ESTIMATE NO. 1 <br /> <br />Date: October 18, 2005 <br />Project: Ebony Street and Utility Improvements 05-23 <br />Contractor: W B Miller Inc. <br />Current Contract Amount: $247,795.05 <br />Awnrd Date: August 23, 2005 <br /> <br />Thc ~bllowing work has been completed on the above referenced project: <br /> <br />Item Description Qnty Unit Unit Price Extension <br /> <br />1 Mobilization 0.75 Is <br />2 Traffic Control 0.5 Is <br />3 Sawcut Bit. 550 ft <br />4 Remove C & G 560 ft <br />5 Remove Bit Pvmnt 5255 sq yd <br />6 Connect to San Sewer 1 Is <br />7 8 in San sewer 434 ft <br />8 48 in san MH 1 ea <br />9 8 X4 wye 4 ea <br />10 8 X 6 wye 2 ea <br />~ 1 4 in Service pipe 131 ft <br />12 6 in service pipe 78 ft <br />13 Connect to watermain 2 ea <br />14 8 in DIP 938 ft <br />1.5 Hydrant w/valve 1 ea <br />16 8 in gate valve 1 ea <br />17' 1 in copper service 124 ft <br />18 1 in curb stop w/box 4 ea <br />19 4 in DI service pipe 116 ft <br />20 4 in valve w/box 2 ea <br />21 DI ftgs 1050 lbs <br />22 Class 5 0 tn <br />23 Bit Base course 0 tn <br />24 Bit Wear course 0 tn <br />25 Conc C&G 0 ft <br />~_o 2X3 CB 2 ea <br />27 72 in Stm MH 0 ea <br />28 60 in Stm MH 1 ea <br />29 18 in RCP pipe 393 ft <br />30 24 in RCP pipe 0 ft <br />31 27 in RCP pipe 0 ft <br /> Water Quality Treat <br />32 System 0 Is <br />33 Conc sidewalk 0 sq yd <br />34 Conc ped ramp 0 ea <br />3b Topsoil borrow 0 cu yd <br />3d Sod 0 sq yd <br /> <br />7000.00 $ 5,250.00 <br />1300.00 $ 650.00 <br />3.15 $ 1,732.50 <br />3.15 $ 1,764.00 <br />4.00 $ 21,020.00 <br />525.00 $ 525.00 <br />14.00 $ 6,076.00 <br />2265.00 $ 2,265.00 <br />52.00 $ 208.00 <br />63.00 $ 126.00 <br />17.60 $ 2,305.60 <br />18.00 $ 1,404.00 <br />520.00 $ 1,040.00 <br />25.85 $ 24,247.30 <br />2825.00 $ 2,825.00 <br />860.00 $ 860.00 <br />12.50 $ 1,550.00 <br />100.00 $ 400.00 <br />21.00 $ 2,436.00 <br />550.00 $ 1,100.00 <br />1.45 $ 1,522.50 <br /> 0.10 $ - <br /> 35.35 $ - <br /> 35.35 $ - <br /> 10,20 $ <br />1525.00 $ 3,050.00 <br />3175.00 $ <br />24O0.OO $ 2,4OO.O0 <br />3O.O0 $ 11,790.00 <br />36.OO $ <br />44.O0 $ <br /> <br />41,300.00 $ <br />33.55 $ <br />475.00 $ <br />1.00 $ <br />3.15 $ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.