My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/25/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 10/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:42:39 PM
Creation date
10/25/2022 9:11:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/25/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 14. <br />Meeting Date: 10/25/2022 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #22-246 Approving Change Order #1 for Improvement Project #22-10, Public Works Salt Shed <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #22-246 approving Change Order #1 for Improvement Project <br />#22-10, Public Works Salt Shed. <br />Background: <br />While constructing the new salt shed at Public Works it was discovered that the underlying soils needed soil <br />corrections, which were not identified within the plans and specifications. The underlying soils were found to <br />have numerous decaying tree stumps embedded within the soils, as well as significant pockets of organic soils, <br />which would not adequately support the salt shed structure. <br />Soils borings were not completed within the footprint of the salt shed prior to design and preparation of plans and <br />specifications because the soil borings completed with the Public Works Facility project did not indicate that any <br />soils on site would require soils corrections. Therefore, the plans and specifications did not account for any soil <br />corrections. <br />Attached is a copy of Change Order #1, which identifies all of the soil correction quantities and costs, which total <br />$27,420. <br />City Council approval of this change order is being requested after -the -fact as the soils corrections work was <br />completed in advance of receiving City Council approval of Change Order #1 to allow construction of the salt <br />shed to continue unimpeded so the salt shed will be operational in time for its intended use this winter. <br />The City Engineer will sign the Change Order following City Council approval. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Alternative #1 - Adopt Resolution #22-246 approving Change Order #1 for Improvement Project #22-10, Public <br />Works Salt Shed. <br />Recommendation: <br />Staff recommends adopting Resolution #22-246 approving Change Order #1 for Improvement Project #22-10, <br />Public Works Salt Shed. <br />Action: <br />Adopt Resolution #22-246 approving Change Order #1 for Improvement Project #22-10, Public Works Salt <br />Shed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.