My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/25/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 10/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:42:39 PM
Creation date
10/25/2022 9:11:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/25/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order <br />PROJECT: (name and address) <br />Ramsey Salt Storage Building <br />14199 Jaspar Street NW <br />OWNER: (name and address) <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />CONTRACT INFORMATION: <br />Contract For: General Construction <br />Date:April 12, 2022 <br />ARCHITECT: (name and address) <br />pertel Architects, Ltd. <br />1795 Saint Clair Avenue <br />Saint Paul, MN 55105 <br />CHANGE ORDER INFORMATION: <br />Change Order Number: 001 <br />Date: October 11, 2022 <br />CONTRACTOR: (name and address) <br />A & B Construction, Ltd. <br />30810 200th Street <br />Harper, IA 52231 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed <br />upon adjustments attributable to executed Construction Change Directives.) <br />Soil corrections as required and directed by the on -site soil engineer and observed by the City of Ramsey on -site <br />observer. <br />Attached to this change order is a breakdown provided by A&B Construction, as approved by the city's on -site observer. <br />The original (Contract Sum) was 469,110.00 <br />The net change by previously authorized Change Orders 0.00 <br />The (Contract Sum) prior to this Change Order was $ 469,110,00 <br />The (Contract Sum) will be (increased) by this Change Order in the amount of $ 27,420.00 <br />The new (Contract Sum) , including this Change Order, will be $ 469,530.00 <br />The Contract Tiine will be (increased) by seven ( 7 ) days. <br />The new date of Substantial Completion will be Friday, November 4, 2022 <br />Corrected Total: 496,530.00 <br />NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the <br />Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon <br />by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change <br />Directive_ <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Oe el Architects <br />ARC <br />Andrew Coo ar - Principal <br />PRINTED NAME AND TITLE <br />October 11, 2022 <br />DATE <br />A&B Construction City of Ramsey <br />CONTRACTOR (Firm name) OWNER (Firm name) <br />3-t-4_47_1 <br />SIGNATURE <br />Ben Striegel <br />SIGNATURE <br />PRINTED NAME AND TITLE PRINTED NAME AND TITLE <br />10/13/22 <br />DATE <br />DATE <br />AIA Document G701711 — 2017. Copyright CI 1979, 1987, 2000, 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING <br />This AIA Document Is protected by UE. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' <br />Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the <br />law. This document was created on 10/10,2022 11:35:01 under the terms of ATA Documents-or-Dernandim Order No_ 2114371101 , and is not for <br />resale• This document is licensed by The American rnstitute of Architects for one-time use only, and may not be reproduced prior to its completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.