Laserfiche WebLink
Met Council 15% increase <br />2023 PROPOSED <br />it <br />H <br />O <br />p <br />p <br />O <br />a, <br />245.00 <br />38.00/sq yard <br />O <br />O <br />In <br />N <br />FEMA Rates <br />245.00 <br />35.00/account <br />6.00% <br />83.48 <br />83.48+3.48/1000 gal. <br />1,349.00 <br />O <br />O <br />O <br />4 <br />5,418.00 <br />8,920.00 <br />71" 2022 Adopted <br />O <br />Oiri <br />O <br />Cl <br />10.00/transmission <br />5.00 min chg + 1.00/print <br />© <br />O <br />N <br />CSC <br />00 <br />O <br />.� <br />E <br />95.00+15.00/Driveway, 20.00/Road Closing <br />+ $10,000 Bond per mile <br />E. <br />O <br />O <br />N <br />95.00\+.05/linear foot <br />Developer Installed <br />^O <br />O" <br />N <br />Price + Tax <br />Per Policy <br />© <br />© <br />tinC <br />''� <br />71. <br />© <br />N <br />N <br />© <br />O <br />N <br />© <br />O <br />--I <br />250.00 <br />© <br />O <br />,--Ioo <br />30.00/account <br />5.50% <br />o <br />O© <br />a" <br />4 <br />,-4 <br />75.89 <br />75.89+3.16/1000 gal. <br />in excess of 20,000 gal. <br />1,306.00 <br />3,933.00 <br />5,245.00 <br />8,635.00 <br />Per Connexus Energy Fee Schedule <br />Developer Installed <br />Per Connexus Energy Fee Schedule <br />294/light <br />9.01/qtr <br />tea" <br />1.37/qtr <br />r.. <br />a" <br />SPECIAL NOTES <br />5 <br />Always follow IRS adopted rate <br />Street and Traffic Charges <br />City Installed <br />Per Special Assessment Policy <br />Per FEMA Schedule of Equipment Rates <br />Traffic Sign Replacement (each) <br />UTILITY RATES <br />Past due on current billing <br />Recycling Rates <br />Residential Curb -side Program fee/qtr 1 Per Ace Contract <br />Sewer Rates <br />Per 2016 Comprehensive Sewer Study <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />based on national/local construction cost index 6/22 3.3% <br />W <br />4 <br />W <br />C.)'6 <br />ICI <br />p <br />W <br />r <br />I.. <br />W <br />z <br />Photo CD <br />Photo Electronical Transfers <br />Photo Reprints <br />Vehicle Lockout <br />Vehicle Storage <br />Mileage/personal vehicle (IRS allowable rate) <br />O <br />Permit Fee - Boring/Open Trench <br />Boulevard Tree Replacement <br />Permit Fee - Overhead <br />Developer contribution: <br />street and/or traffic signs (each) <br />Bituminous Paving/Patching <br />Road Improvement Assessment <br />Sidewalk Panel Removal and Replacement Escrow <br />Street Sweeping: Equipment Only: <br />Cigarette Sales (vending and over -the counter) <br />Cigarette Sales with age verification technology <br />E-Cigarette Sales <br />E-Cigarette Sales with age verification technology <br />Assessment Charge for Unpaid Items Assessed <br />Interest Rate on Unpaid Items Assessed <br />Penalty/late payment <br />Residential/Single dwelling usage fee/qtr <br />Multi-family(apt) & commercial usage fee/qtr <br />Connection charge/res. equivalent <br />C <br />5 <br />O <br />L <br />C� <br />,. <br />cs <br />U <br />C: <br />O <br />v <br />Lateral Benefit Charges: Residential <br />Lateral Benefit Charges: Commercial <br />Street Lights <br />Developer contribution: <br />installation of Cobra street light <br />traditionaire subdivision street light (w/100 ft of wire) <br />New ROW COR Lights <br />street light 0 & M 3 year @ $98/year <br />Residential billing: <br />urban subdivision street light rate per lot (>7/92) <br />rural subdivision street light rate per lot <br />priority street light rate per residential/apartment/ lot <br />s <br />.. <br />C <br />Storm Water Management Rates <br />