My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/15/2005
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2005
>
Agenda - Public Works Committee - 11/15/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:30:03 PM
Creation date
11/10/2005 3:48:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(.3) <br /> <br />(4) <br /> <br />(6) <br /> <br />(7) <br /> <br />(8) <br /> <br />(9) <br /> <br />(l'0) <br /> <br /> CITY :'O F I~MS E Y <br />Street Maintenance Program Assessment Practices <br /> <br />Projects are identified by individual subdivisions, or by ~ouping Of subdivision <br />and lots having similar pavement histories and conditions and similar pavement <br />are~ per benefited unit. <br /> <br />An assessment share will be calculated by determin.ing the total assessable cost of <br />the project and dividing by the number of benefited units. <br /> <br />Where and individual lot has more than one frontage and not ali frontages are <br />scheduled to receive an improvement, or the same type of improvements, the lot <br />will be considered benefited and be assessed a full share for the improvement <br />which is conducted along the frontage of the lot that contains the main driveway <br />opening. <br /> <br />For sealcoats and overlays the amount assessed to benefited Property owner is <br />50% of the total project cost including overhead costs. (1991) : <br /> <br />Projects involving streets which have had previous proposed maintenance projects <br />defeated by petition shall be ineli~ble to receive the City's 50% contribution, if <br />the 'project requires a more expensive maintenance. (i.e. streets proposed for <br />sealcoating project which was defeated by citizen petition now are'proposed for a <br />bituminous overlay) (1993) <br /> <br />Where the rule of dividing the assessable project cost by the' number of benefited <br />un/ts (no 2 above) would result in an assessable share which is grossly out of <br />proportions to the assessable share being charged to similar lots receiving similar <br />improvements, the City Council may elect to assess such lots the average <br />assessable share being made to lots receiving similar improvements for that <br />project year. (1996) <br /> <br />Where a benefited area contains commercial lots having w!dely varying sizes, the <br />assessment shall be made based on area of ate lot. (2003) <br /> <br />Where an individual lot has more than one frontage including a driveway frontage <br />on a state or county road, and a non-dn3/eway frontage on a MSA or city street, <br />one-half assessment share will be made for an improvement to the MSA or City <br />street. (1995) <br /> <br />Where an individual lot has a single frontage on an MSA street, such lots will be <br />assessed the average assessable share for the type of improvement made to non- <br />MSA streets receiving that improvement. (1992) <br /> <br />Whenever possible townhouse units shall, be aggregated into individual projects <br />having a single land use. fa~ instances where tow~St~ouse units must be combined in <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.