My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/07/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 11/07/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:43:31 PM
Creation date
11/10/2022 12:38:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/07/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION: The City of Ramsey (City) is requesting proposals for the delivery of a <br />topographic survey for the streets within the Whispering Pines Estates Plate 3 subdivision, <br />generally located west of Armstrong Boulevard between the 157th and 158th blocks. If selected <br />Staff will bring the proposal to the Tuesday, November 8, 2022 City Council meeting for award. <br />1. Whispering Pines Estates Plat 3 <br />a. Right of Way is generally 66 feet wide <br />b. Streets total approximately 1.72 miles in length <br />i. 14.7-acre area <br />ii. Rural residential subdivision with mostly open right of way area <br />1. Generally, shots of the tree line will be sufficient where trunks are <br />located on the yard side of street drainage swales <br />2. Stand alone and trees on street in -slope; trunk shots are needed <br />c. 24-foot wide rural section streets <br />d. Additional 100 feet beyond EOP area beyond the right of way at south end of Eland <br />Street <br />i. Topo beyond the right of way on three properties is pending permission to <br />access properties from the residents. <br />e. Speed limit is 30 mph <br />i. Rural residential, thru traffic is not anticipated <br />2. The scope of this work includes: <br />a. Topographic Survey <br />b. Contacting Gopher State One Call to locate utility markings <br />c. Delivery of survey points in an Excel/CSV format <br />d. Point Code listing <br />FIELD SURVEY REQUIREMENTS: The field survey is not limited to, but is expected to <br />include the following: <br />• Elevations along the centerline, edge of bituminous pavement, top and bottom of swale, <br />and boulevard up to the right-of-way at 50-foot stations and grade changes. <br />• Location and elevations on driveway edges and corners to the right-of-way <br />• Location and elevations of any storm sewer, sanitary sewer, watermain, utilities, structures, <br />etc. within the survey area <br />o Municipal Utilities do not exist in area beyond street crossing culverts <br />• Locations and elevations of trees/tree lines, landscaping, mailboxes, signage, fence lines, <br />etc. within the survey area <br />• General top and bottom of slopes, and intermediate spot elevations in swales <br />SCHEDULE: A written schedule of the work shall be submitted identifying all work components <br />and showing work start and completion dates required to comply with the schedule. Once work <br />has commenced, the Contractor shall continuously pursue completion in accordance with the <br />approved schedule. The final Topographic Survey must be delivered to the City by Friday, <br />December 2, 2022. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.