My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/15/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 11/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:39:02 AM
Creation date
11/10/2022 3:25:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee <br />Meeting Date: 11/15/2022 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />5.3. <br />Title: <br />Consider Recommending City Council Authorization to Prepare Plans and Specifications for 2023 Pavement <br />Management Program Projects <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council authorization to prepare plans and <br />specifications for 2023 Pavement Management Program projects. <br />Background: <br />The proposed 2023 — 2032 Capital Improvement Program (CIP) identifies four (4) street reconstruction projects, <br />two (2) pavement overlay improvement projects, and one (1) parking lot reconstruction project as part of the 2023 <br />Pavement Management Program (PMP). <br />To date, City Council has authorized preparation of plans and specifications for two street reconstruction projects, <br />which are Improvement Project #23-01, 161st Avenue Reconstruction, and Improvement Project #23-04, 167th <br />Avenue Reconstruction. The following projects have not yet received authorization to prepare plans and <br />specifications: <br />IP 23-02 Central Park Main Parking Lot Reconstruction <br />IP 23-05 Barthel's Rum River Acres 2nd Street Reconstructions <br />IP 23-06 2023 MSA Pavement Overlay Improvements (MSA) <br />IP 23-07 2023 Neighborhood Pavement Overlay Improvements <br />IP 23-10 Whispering Pines Estates Plat 3 Street Reconstructions <br />Street segment summaries are attached to this case. <br />Topographic Surveys <br />IP 23-02; City Council awarded the proposal for topographic survey to Bolton & Menk on April 12, 2022. Staff <br />has received and performed a basic review which confirmed the requested survey was complete and thorough. <br />IP 23-05; City Council awarded the proposal for topographic survey to Hakanson Anderson on August 23, 2022. <br />Staff has received and performed a basic review which confirmed the requested survey was complete and thorough. <br />1P 23-06, 23-07, and 23-10; City Council awarded proposals for topographic surveys to Bolton & Menk on <br />November 7, 2022. Surveys are due by December 2, 2022. <br />The surveys will be used to create an existing ground surface and locate features once project design begins. <br />Geotechnical Reports <br />1P 23-02, 23-05; City Council awarded the proposals for geotechnical reports to Haugo Geotechnical Services on <br />August 23, 2022. Staff has received these reports and has done an initial review, confirming the reports were <br />complete and met the requirements of the proposals. <br />IP 23-10; City Council awarded a proposal to Haugo Geotechnical Services on November 7, 2022. The <br />geotechnical report is due December 30, 2022. <br />IP 23-06, 23-07; Geotechnical Reports are not required for pavement overlay improvements. <br />Anticipated Project Scopes <br />
The URL can be used to link to this page
Your browser does not support the video tag.