My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 11/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:45:25 PM
Creation date
11/29/2022 11:22:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
does not propose to extend sanitary sewer as part of the 167th Avenue Reconstruction. Currently, the northeast <br />quadrant of Nowthen Boulevard and 167th Avenue includes the only MUSA property along the proposed <br />improvements. This quadrant can be served from the sanitary sewer line extended south as part of the Brookside <br />Elementary School project. If sanitary sewer was ever needed along 167th Avenue, it could be installed by <br />directional drilling in the future. <br />The majority of the project is rural section, and stormwater runoff is handled through drainage swales and <br />culverts along both sides of the road. The urban section just west of TH 47 does include storm sewer inlet <br />structures and piping. Staff will evaluate the condition of the swales, culverts, and storm sewer inlets during <br />project design. Staff is aware some re -grading of the swales adjacent to Quicksilver Street on the north side of <br />167th Avenue will be required. <br />Estimated project costs per the 2022 — 2031 CIP are $1,492,260. These costs do not reflect the increased <br />construction costs Staff has observed during 2022 due to inflation in the construction industry. Preliminary work <br />on the 2023 — 2032 CIP has begun internally, including updating project costs. A more appropriate estimated cost <br />for the work is $1,848,000. This does not include the cost for an additional bicycle / pedestrian facility, or any <br />municipal utility extensions. Staff proposes to develop plans and specifications in-house as part of their normal <br />duties. <br />The street improvements proposed with this project are identified in the City's current 10-year CIP, and can be <br />funded using a combination of MSA Funds and Storm Water Utility Funds. This project would best be <br />constructed as a stand-alone project and is necessary, feasible, and cost-effective from an engineering standpoint, <br />and can be constructed as proposed herein. <br />The proposed improvements are designated as City Improvement Project #23-04, 167th Avenue Reconstruction. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Motion to adopt Resolution #22-201 Ordering Plans and Specifications for Improvement Project #23-04, 167th <br />Avenue Reconstruction. <br />Funding Source: <br />Funding for this improvement is proposed to come from the MSA Fund, and Storm Water Utility Fund. <br />• (MSA) Street Project Cost $1,680,000 <br />• Storm Sewer Project Cost $ 168,000 <br />• Total Estimated Project Cost $1,848,000 <br />Recommendation: <br />Staff recommends adopting Resolution #22-201 ordering plans and specifications for improvement project <br />#23-04, 167th Avenue Reconstruction. <br />Action: <br />Adopt Resolution #22-201 ordering plans and specifications for improvement project #23-04, 167th Avenue <br />Reconstruction. <br />Attachments <br />Res 22-201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.