Laserfiche WebLink
WMO and COR infrastructure/site preparation studies. These studies will set the baseline information for options <br />and cost relating to the installation of remaining infrastructure in the COR, These studies will also include <br />information that will assist in development of The Waterfront park, the potential filling of wetlands for site <br />preparation for Parcel 46 and other parcels in the COR. Staff anticipates that the findings of these studies will be <br />presented in a future work session in January or February. <br />Timeframe: <br />Background and planning on The Waterfront's proposed community building: 10-15 minutes <br />Discussion and inquiries on the park's planning process and timeline: 5 minutes <br />Status of The COR — Public Infrastructure Analysis: <5 minutes <br />Total Timeframe: 20 minutes <br />Funding Source: <br />Park planning work is being performed by staff and consultants funded by the 2022 General Fund parks operating <br />budget. <br />The COR — Public Infrastructure Analysis is being performed by consultants and funded by TIF District <br />14 and/or District 2. <br />Responsible Party(ies): <br />Mark Riverblood will provide a very brief introduction and background on The Waterfront project, and architect <br />Greg Houck will present preliminary design of the proposed park building, together with a description of its <br />utility and feasibility. <br />Sean Sullivan will be available to address the wetland delineation/mitigation process (an element of the attached <br />COR —Public Infrastructure Analysis and Wetland Delineation scope of work) and site preparation work required <br />for Parcel #46 and other lands in the COR, if needed. <br />Bruce Westby will be available to address the status and next steps of The COR — Public Infrastructure Analysis, <br />if needed. <br />Outcome: <br />This work session case is a brief report to Council on the potential of a community building and associated park <br />elements proposed for The Waterfront. (A more in depth discussion on the park andThe COR — Public <br />Infrastructure Analysis is anticipated early in 2023.) <br />2018 planning for The COR parks <br />community building site plan features <br />rendering of splash pad area <br />working model of community building <br />Architect portfolio <br />public infrastructure scope of work <br />Wetland scope of work <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />